BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 21, 2026 at 8:00 PM

Updated August 27, 2026

Site work, paving and renovation of a mixed-use development in Hammond, Louisiana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Grade and shape base (695 SY) for removal and replacement of 340 SY of 6" th. PC Concrete and 400 SY of 8" th. PC Concrete; installation of about 150 TN of limestone base; 280 LF of full depth sawcut; 260 LF of barrier curb ("tack-on" type); installation of concrete sidewalk with brick paver inlays (about 50 SY of PCC sidewalk and 155 SF of brick pavers); 2 EA TYPE VIII catch basins; 130 LF of 15" storm drain pipe; 2,400 LF of painted roadway markings; 4 EA light fixture pedestals; 400 LF of electrical conduit (3/4" -212"); miscellaneous sitework and erosion control; and related work as called for on the drawings, indicated on the Bid Form, or reasonably implied. Removal and replacement of 240 SY of 8" th. PC Concrete; installation of 50 TN of limestone base; and 150 LF of full depth sawcut. Each BID must be accompanied by a BID bond payable to the OWNER for five percent (5%) of the total amount of the BID. As soon as the BID prices have been compared, the OWNER will return the BONDS of all except the three lowest responsible BIDDERS. When the Agreement is executed the bonds ofthe two remaining unsuccessful BIDDERS will be returned. The BID BOND of the successful BIDDER will be retained until the payment BOND and performance BOND have been executed and approved, after which it will be returned. A certified check may be used in lieu of a BID BOND. A performance BOND and a payment BOND each in the amount of one-hundred percent (100%) of the CONTRACT PRICE, with a corporate surety approved by the OWNER, will be required for the faithful performance of the contract. BASE BID Contract Term: 90 calendar days BASE BID Construction Cost Estimate: $170,935 The OWNER shall provide to BIDDERS prior to BIDDING, all information which is pertinent to, and delineates and describes, the land owned and rights-of-way acquired or to be acquired. Question Deadline 08/13/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing not less than seven (7) calendar days prior to the opening of bids.

Bid Results

Roads / Highways

$134,375.00

Public - City

Paving, Renovation, Site Work

13

11

2

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
232
Active Projects
79
Bidding Soon
884
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2026

September 21, 2026

Project location map

Multiple Locations, Hammond, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.