Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 10, 2026 at 8:00 PM
Updated October 16, 2026
Remodeling of a residential development in Milwaukee, Wisconsin. Completed plans call for the remodel of a residential development.
The Owner reserves the right to reject any and all bids and to waive informalities. Remove and replace defective (sunken) front (south) concrete section, adjacent to porch steps (to make porch steps, code compliant) and defective west sections (4) near rear porch. Form, pour, and broom finish, include all necessary metal reinforcements, wire mesh and expansion felt. Backfill topsoil (screen), seed, straw or sod, as needed. 1 Install new 100 amp meter and mast, to code 2 Remove and replace defective (sunken) front (south) concrete section, adjacent to porch steps (to make porch steps, code compliant) and defective west sections (4) near rear porch. Form , pour. and broom finish, include all necessary metal reinforcements, wire mesh and expansion felt. Backfill topsoil (screen), seed, straw or sod, as needed. GARAGE Raze garage structure, and dispose of. PORCH (ES) - Install downspout extension to existing DS 4' to 6' foundation wall to runoff grass areas. Cap off downspout receivers (do not use concrete) Prepare and paint all previously painted porch trim, complete,, Color selection (TBD) by owner EXTERIOR (HOUSE) Install address number house wall, alley side Adjust existing gutters east to ensure proper run-off. Install Gagas adapter to receiver (N /W/E) and downspout extension 4' to 6' form foundation wall to runoff grass areas, where doesn't create hazard. Cap off |downspout receivers (do not use concrete) Remove and replace defective front and rear security doors. Install new front and rear security doors and entry prehung panel steel doors, include new locksets deadbolt (single cylinder) and entry locks, peep holes keyed alike Replace all rotten, defective and missing house trim ; windows , sills , doors, etc. Make any adjustment needed to framing to accommodate new vinyl replacement windows. Install new aluminum coil wrap (clad) to all window, door trim. Color selection (TBD) by owner. Replace front and rear porch guard/step railings to both open sides, with heavy duty aluminum powder coated or Iron guard/steps railings., include orated columns. Ensure proper spacing less 4" spindles, to code Patch cracks to concrete porches (front and rear) with an approved cement repair product, per manufactures application. Prepare, prime and paint concrete porches and brick columns, complete, color selection (TBD) by owner. Install new vinyl replacements double hung windows throughout entire dwelling (include aluminum blind stops and caulk). Repair existing vinyl windows to ensure operable or replace with new if needed. Reframe (west), header etc., to code1st floor kitchen window to original size opening and install new vinyl replacement window. Install temper glass to halls and bathrooms (glass block windows, with vent) replacement windows. Contractor must notify Health Dept. prior to making repairs and must obtain a final approved lead clearance. Repair all defective outlets (receptacles), switches and ceiling and wall light fixtures, including GFCI's receptacles (outlets) in bathrooms and kitchen (1st floor ), laundry within 6' water source, to code. Disengage hanging unused wiring in basement. Install missing junction covers , screw shut electrical junction box. Install light fixtures in basement to provide adequate lighting in basement. Install missing wall/ceiling (cover plates/outlets/switches/ light fixtures/globes). Ensure all electrical throughout entire dwelling is code compliant faucets, sprayer, water lines, p-trap and shut offs., in existing location to owners specification. Install new bathtubs and tub surrounds to bathrooms (1st and 2nd floor) tub/shower areas, Repair subflooring in bathtub/shower area, as needed. Install shower mixer, head and spouts. Install new vanities/tops complete with faucet and new water closet (toilets). Install all new water lines, shut offs and drain pipes, and caulk, with 100% silicone caulk,. to code Repair sub-floors kitchen (1st & 2nd floor), bathrooms, as needed. Install sheet vinyl/ vinyl plank (waterproof) to front and rear entry halls, kitchens (include pantry's), bathrooms to Manufactures specifications, include new 1/4 rd . or shoe molding (paint to match) and transiting floor strips or vinyl base as needed. START AND COMPLETION OF WORK The work presented in this project is to be started within 15 days after Contractor's receipt of a Notice to Proceed and is to be satisfactorily completed within 45 days thereafter. Interior/Exterior Completion and/or Weather-Affected repairs, if any, must be completed as further outlined and incorporated in Bid Attachments A and/or B respectively. (Strike if not applicable.)
Post-Bid
Residential Subdivision
$30,000.00
Public - City
Remodeling
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 9, 2026
November 9, 2026
246 W Keefe Ave, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: Jan 21 2026
Milwaukee, WI
Bid Date: Jan 27 2026
Milwaukee, WI
Bid Date: Dec 23 2025
Milwaukee, WI
Bid Date: Jan 15 2026
Milwaukee, WI
Bid Date: Jan 05 2026
Milwaukee, WI
Bid Date: Jan 06 2026
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Jan 15 2026
Milwaukee, WI
Bid Date: Dec 19 2025
Milwaukee, WI
Bid Date: Jan 15 2026
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Jan 13 2026
Milwaukee, WI
Bid Date: Dec 19 2025
Milwaukee, WI
Bid Date: Jan 20 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed