Published December 17, 2025 at 7:00 PM
Updated December 18, 2025
Site work for a water / sewer project in Douglasville, Georgia. Completed plans call for site work for a one-story above grade water / sewer project.
The scope of work includes all labor, materials, equipment, tools, transportation, and supplies necessary to complete the Blairs Bridge Road Stormwater Improvement Project. The project consists of the removal of approximately 92 linear feet of two 35"x24" arch-corrugated metal pipes (CMP) and the surrounding pavement, installation of two new 34"x53" elliptical reinforced concrete pipes (RCP) with lengths of 67 feet and 73 feet, installation of two new concrete headwalls, and approximately 166 linear feet of guardrail. Road restoration is required after installation of the new culvert. All work is to be performed within Authority easements or public right-of-way. Detailed scope and requirements are available in the Special Conditions and Appendices. Bidders are required to obtain the full bid package for their bids to be responsive. Bid packages may be purchased for $125.00. Bids must be sealed and received by the Authority at its offices, and late bids will not be accepted. All prospective bidders must hold a current Georgia Utility Contractors License and be or promptly qualify for inclusion on the Authority's Approved Contractor List without restriction or probationary status. Bid security in the amount of 5% of the total bid price must accompany all bids. The Authority reserves the right to reject any or all bids, or to waive technicalities and informalities. The scope of work includes the provision by the contractor of all labor, materials, equipment, tools, transportation, and supplies necessary to provide a complete and functioning product as described by the Instructions and Information to Bidders and Contract Documents including Construction Documents for the Project. All services will be "turnkey" and require minimal involvement of Authority personnel. The contractor is responsible for verifying the dimensions of the existing conditions A. Only quantities listed in the bid schedule shall be measured for payment, unless the Owner has approved extra work in accordance with the Contract Documents and has so advised the Contractor before the work was actually performed. B. Any and all other materials, labor, etc., furnished and required shall be considered as incidental to the items to be measured. C. The unit or lump sum prices bid for the various items shall be full compensation for furnishing all materials, tools, equipment, labor and incidentals necessary and required to complete the work as shown on the plans and called for in the specifications. D. The quantities to be paid for shall be determined by actual measurement of the amounts placed. The Engineer shall make all measurements and the Contractor shall make certain all work has been measured before concealing; otherwise, Contractor may be required to uncover or make accessible any work so concealed in order to receive payment for such items. 1. Erosion control measures shall be designed for a 25-year, 24-hour rain event. 2. Erosion control shall be employed during the construction period and shall include all measures required to prevent soil erosion from the site until permanent erosion control measures are installed. Work shall be accomplished through, but not limited to, the use of berms, dikes, sediment barriers, sediment traps, sediment basins, silt fences, temporary grasses, check dams, mulching, construction exits and slope drains. 3. Erosion control measures described herein shall be continued until such time as permanent planting and restoration of natural areas is effectively in control of erosion from project site. 4. Failure to install and maintain temporary erosion control measures throughout the construction period may be cause to halt construction by governing authorities until such measures are correctly installed and operational.
GC Bidding
Water / Sewer
$400,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 14, 2026
February 13, 2026
Blairs Bridge Road, Douglasville, GA
Related To This Project
Douglasville, GA
Bid Date: Jan 27 2026
Douglasville, GA
Bid Date: Jan 23 2026
Douglasville, GA
Bid Date: Dec 30 2025
Douglasville, GA
Bid Date: Dec 10 2025
Douglasville, GA
Bid Date: Dec 10 2025
Douglasville, GA
Bid Date: Dec 17 2025
Douglasville, GA
Bid Date: Dec 10 2025
Douglasville, GA
Bid Date: Jul 23 2021
Douglasville, GA
Bid Date: Dec 10 2025
Douglasville, GA
Bid Date: Nov 25 2025
Douglasville, GA
--
Douglasville, GA
Bid Date: Nov 27 2025
Douglasville, GA
Bid Date: Nov 05 2025
Douglasville, GA
--
Douglasville, GA
Bid Date: Nov 06 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.