BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 17, 2025 at 7:00 PM

Updated December 18, 2025

Site work for a water / sewer project in Douglasville, Georgia. Completed plans call for site work for a one-story above grade water / sewer project.

The scope of work includes all labor, materials, equipment, tools, transportation, and supplies necessary to complete the Blairs Bridge Road Stormwater Improvement Project. The project consists of the removal of approximately 92 linear feet of two 35"x24" arch-corrugated metal pipes (CMP) and the surrounding pavement, installation of two new 34"x53" elliptical reinforced concrete pipes (RCP) with lengths of 67 feet and 73 feet, installation of two new concrete headwalls, and approximately 166 linear feet of guardrail. Road restoration is required after installation of the new culvert. All work is to be performed within Authority easements or public right-of-way. Detailed scope and requirements are available in the Special Conditions and Appendices. Bidders are required to obtain the full bid package for their bids to be responsive. Bid packages may be purchased for $125.00. Bids must be sealed and received by the Authority at its offices, and late bids will not be accepted. All prospective bidders must hold a current Georgia Utility Contractors License and be or promptly qualify for inclusion on the Authority's Approved Contractor List without restriction or probationary status. Bid security in the amount of 5% of the total bid price must accompany all bids. The Authority reserves the right to reject any or all bids, or to waive technicalities and informalities. The scope of work includes the provision by the contractor of all labor, materials, equipment, tools, transportation, and supplies necessary to provide a complete and functioning product as described by the Instructions and Information to Bidders and Contract Documents including Construction Documents for the Project. All services will be "turnkey" and require minimal involvement of Authority personnel. The contractor is responsible for verifying the dimensions of the existing conditions A. Only quantities listed in the bid schedule shall be measured for payment, unless the Owner has approved extra work in accordance with the Contract Documents and has so advised the Contractor before the work was actually performed. B. Any and all other materials, labor, etc., furnished and required shall be considered as incidental to the items to be measured. C. The unit or lump sum prices bid for the various items shall be full compensation for furnishing all materials, tools, equipment, labor and incidentals necessary and required to complete the work as shown on the plans and called for in the specifications. D. The quantities to be paid for shall be determined by actual measurement of the amounts placed. The Engineer shall make all measurements and the Contractor shall make certain all work has been measured before concealing; otherwise, Contractor may be required to uncover or make accessible any work so concealed in order to receive payment for such items. 1. Erosion control measures shall be designed for a 25-year, 24-hour rain event. 2. Erosion control shall be employed during the construction period and shall include all measures required to prevent soil erosion from the site until permanent erosion control measures are installed. Work shall be accomplished through, but not limited to, the use of berms, dikes, sediment barriers, sediment traps, sediment basins, silt fences, temporary grasses, check dams, mulching, construction exits and slope drains. 3. Erosion control measures described herein shall be continued until such time as permanent planting and restoration of natural areas is effectively in control of erosion from project site. 4. Failure to install and maintain temporary erosion control measures throughout the construction period may be cause to halt construction by governing authorities until such measures are correctly installed and operational.

GC Bidding

Water / Sewer

$400,000.00

Public - County

Site Work

15

13

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
96
Bidding Soon
2,052
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2026

February 13, 2026

Project location map

Blairs Bridge Road, Douglasville, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.