Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 16, 2025 at 7:00 PM
Updated January 13, 2026
Site work and renovation of a municipal facility in Wytheville, Virginia. Completed plans call for the renovation of a 43,000-square-foot municipal facility.
Roofing System Wythe ESS Building - Installation of Roof System. Reference-Wythe ESS Building at George James Drive, Wytheville, VA approx. 43,000 sq. ft. of Roof Area Mount Rogers Community Services is currently soliciting bids for roof system at Wythe ESS Building located at 255 GEORGE JAMES DR., WYTHEVILLE, VA 24382 REQUIRED system with 20-year warranty. Furnish and install Expanded Polystyrene insulation board between raised flutes of metal panel roof system. Mechanically attach 1" ISO Insulation cover board over EPS flute filler to provide a smooth rigid roof surface. Mechanically attach single ply TPO roofing membrane per manufacturer's recommendations. To Include a roof system manufacturer's 20 year no dollar limit, labor and material warranty. Install wood blocking as required at the eaves and rakes. Terminate at rake perimeter with 24ga prepainted metal gravels top with continuous 22 ga galvanized cleat. Terminate at the gutter edge with 24 ga prepalnted metal drip edge. Flash all walls, pipes, curbs, and other penetrations per roof manufacturer's specifications. Clean up and remove project related debris. Section 2: Remove and dispose of existing EPDM membrane and underlying insulation. Furnish and install Expanded Polystyrene insulation board between raised flutes of metal panel roof system. Mechanically attach 1" ISO Insulation cover board over EPS flute filler to provide a smooth rigid roof surface. Mechanically attach single ply TPO roofing membrane per manufacturer's recommendations. To Include a roof system manufacturer's 20 year no dollar limit, labor and material warranty. Install wood blocking as required at the eaves. Install membrane up the parapet walls and terminate below the existing coping to remain. Flash all walls, pipes, curbs, and other penetrations per roof manufacturer's specifications. Clean up and remove project related debris.
Post-Bid
Municipal
$300,000.00
Public - City
Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 12, 2026
February 11, 2026
255 George James Dr, Wytheville, VA
Related To This Project
Wytheville, VA
--
Wytheville, VA
--
Wytheville, VA
--
Wytheville, VA
--
Wytheville, VA
--
Wytheville, VA
--
Wytheville, VA
--
Wytheville, VA
Bid Date: Feb 18 2026
Wytheville, VA
Bid Date: Jan 15 2026
Wytheville, VA
Bid Date: Feb 25 2026
Wytheville, VA
Bid Date: Dec 02 2025
HVAC Mechanical Preventative Maintenance and On-Call Repair Services Division 4 Wytheville - 5902181
Wytheville, VA
Bid Date: Oct 20 2025
Wytheville, VA
Bid Date: Oct 16 2025
Wytheville, VA
Bid Date: Nov 19 2025
Wytheville, VA
Bid Date: Oct 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
