Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 11, 2025 at 7:00 PM
Updated December 17, 2025
Site work for a golf course in Milledgeville, Georgia. Completed plans call for site work for a golf course.
Question Deadline 12/17/2025 at 12:00 PM ET Questions may be directed to County Manager Carlos Tobar, at ctobar@baldwincountyga.com PLANNING TrackMan (TM) pole locations identified (Consult with TM Staff for measurement guide). Climate-controlled room for TrackMan server equipment to be provided and located in room adjacent to range. County provided. Minimum of 30Mbps up/down internet with no port restrictions. County provided. Identify power source for each radar to tap into. 120 Volt power; Individual circuits for each radar supporting 150W for each radar. Plan trenching route from each radar back to server location and radar power source. RADAR POLES Install radar poles. See Customer Deliverables Guide for pole specs. Provided 3ft x 3ft concrete base minimum for each radar pole. Counter sink poles in concrete base. Once dry, the top of pole should be very rigid. Stem up conduit on back of pole (away from golfers) for power and fiber in concrete base. rench from server room location and power source to each radar. Lay power and fiber conduit in trenches. Pull 2 pairs (4 strands) of single mode fiber to each radar pole's steel junction box located 18in from the top of the pole. LC/UPC to LC/UPC on both ends. Terminate 2 or 3 pairs of fiber for each radar. Land fiber runs to the switch located in each radar pole's steel junction box. Land fiber runs from each radar to the server rack location. Run conduit, power and fiber cables inside or outside the radar pole to the location of the junction box. CAT 6 CABLING FOR ACCESS POINT(S) Run Cat 6 cables to each Wi-Fi access point location and terminate. (Specifics provided by TM staff). TOUCHSCREENS Designate touchscreen locations (consult with TM Staff on safe distance from hitting mat / height / etc.). Source and install touchscreen poles Run Cat 6 and power cables to each touchscreen location. Each touchscreen requires Cat 6 with RJ45 termination. Each touchscreen's power cable must either be terminated with a plug and outlet or hardwired directly with wire nuts in junction box. WEEK-OF INSTALL CHECKLIST ITEMS All static bays/hitting mats must be in their final locations to enable GPS mapping and test shots. Electrician to be onsite when TM Employees arrive for installation. Fiber contractor to be on call if any issue with TM connections. Schedule boom lift to be onsite when TM Employees arrive for installation. Confirm with TM Staff. PROJECT INSTALLATION GUIDE Please see Exhibit A for more information about the project. Baldwin County reserves the right to reject any and all Bids.
Sub-Bidding
Golf Course
$60,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 19, 2025
January 9, 2026
65 GA-22, Milledgeville, GA
Related To This Project
Milledgeville, GA
Bid Date: Jan 05 2026
Milledgeville, GA
Bid Date: Jan 05 2026
Milledgeville, GA
Bid Date: Jan 22 2026
Milledgeville, GA
Bid Date: Nov 24 2025
Milledgeville, GA
--
Milledgeville, GA
Bid Date: Nov 24 2025
Milledgeville, GA
Bid Date: Oct 30 2025
Milledgeville, GA
Bid Date: Oct 03 2025
Milledgeville, GA
Bid Date: Sep 16 2025
Milledgeville, GA
Bid Date: Sep 16 2025
Milledgeville, GA
Bid Date: Aug 21 2025
Milledgeville, GA
Bid Date: Jul 18 2025
Milledgeville, GA
--
Milledgeville, GA
Bid Date: Jun 09 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
