Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 17, 2025 at 7:00 PM
Updated December 18, 2025
Renovation of a water / sewer project in Lake Forest, Illinois. Completed plans call for the renovation of a water / sewer project.
Lake Forest Water Plant Elevator Project Request for Proposal The full RFP project package must be obtained by contacting Certified Elevator Inspection and Consulting Company: CJ Pavilon, Elevator Consultant, QEI, MBA, Principal Phone: 630.362.8502 E-mail: cjpcei@gmail.com The modernization of as described above under "Equipment Description & Type" shall be an overall turnkey modernization project. The attachment to this Request for Proposal includes specified equipment descriptions and types, and elevator contractor's cost bids reflect their costs predicated on the equipment specified on the attachment. Contractor shall furnish a "Base Bid Amount" as described below. In the Base Bid Amount, the removal, disposal and installation of the new cylinder/piston unit will be made a part of this RFP. In the event any well hole drilling is necessary, the cost quote for this scope of work will be considered as an additional expense to the removal, disposal and installation of the new cylinder/ piston unit quoted price. In addition, Contractor shall furnish costs as cited in the "Allowance' sections as described below. The "Allowance Costs" must be furnished in the RFP and are specific to other outside contractor's costs for work related to electrical work, fire service recall work for code compliance, HVAC upgrades and general carpentry. Contractor shall make arrangements for outside contractors for code compliance upgrades and equipment warranty conditions. Piston/ Cylinder Assembly Installation of new Piston/ Cylinder specified for a 4-5 story rise 12,000 lbs. capacity freight car in accordance with current edition of the elevator A17.1 code requirements Featuring : Double bottom cylinder / piston unit sized for adequate weight capacity Cylinder suitable for adequate weight capacity with new internal guide ring & gland packing New sealed PVC case New cylinder head support Motion Control Installation of a new "Non-Proprietary" motion microprocessor controller by either Motion Control Equipment Company, Smart Elevator Manufacturing or G.A.L. Elevator Company Galaxy Model type products with current code compliant software parameter availability Featuring: Access switches at top & bottom landings New automatic car leveling feature with new selector system Car top inspection station run availability w station inspection run function, stop switch Light & GCFI outlet Access , inspection and independent service features Fire service phase 1 & 2 operations for fire service recall function and phase 2 operations in accordance with the latest edition A17.1 code including all applicable key switches, light jewel indicators voice annunciation and new relays for FAID operation Pump Motor / Control Valve / Tank/ Piping Installation of a new pump motor tank unit w/ control valve (Maxton Type) to power the motion travel with a soft starter for a 12,000-capacity car at the existing car operational speed Installation of a new 4-coil control valve featuring up , down, up leveling, down leveling, pressure relief valve & manual lowering Installation of new schedule #80 Hydraulic line from machine room to pit w connectors and two ball type cut off valves - one in machine room - one in the elevator pit New muffler Door Equipment Upgrades New manual bi folding hoistway doors manufactured by Pelle at the following landings: Landing 1 - 2 Hoistway doors (front & rear) Landing 2 - M - Landing 3 - Landing 4 - 1 Hoistway door (front) 1 Hoistway door (rear) 1 Hoisway door (front) 2 Hoistway doors (front & rear) Installation of new hoistway door interlocks manufactured by GAL or compatible with Pelle doors for all doors listed above The existing car gate can be retained The existing hoistway entrances can be retained Hoistway Equipment Upgrades Installation of new selector assembly compatible w motion control/ controller drive Installation of new terminal stopping device switches for motion control at floor landings Installation of new upper & lower terminal switches Installation of new traveler Installation of new selector assembly Installation of new conductor ducts Retain existing car guides but replacement of guide shoes Retain existing rails Upgrades Inside Car Installation of a new car operating panels w/ LED car buttons and controls including code compliant fire panel with control buttons inside panel , fire service key switches, independent and inspection control switches, lighting and exhaust fan switches, and emergency phone with voice annunciator features for two way communication as per code Installation of new emergency car lighting Retain car interior Hall Fixtures Installation of new LED type hall call features at each landing - Floors 1,2,M,3 & 4 Upgrade Equipment for Elevator Pit Installation of new pit channels & new buffer springs Installation of new LED pit lighting fixture Installation of new emergency pit stopping switch Installation of new sump pump with pump monitoring for flood control Installation of new LED lighting fixture in elevator pit Installation of new pit ladder for egress to elevator pit Please note : This attachment for specifications of equipment includes the modernization project's equipment upgrades specific to the elevator contractors' scope of work and does not include the scope of work from outside contractors. Other outside contractors' scope of work related to electrical, fire service, carpentry, HVAC, well drilling (if required), emergency standby power source are listed separately in the Request for Proposal under the "Allowances" sections an all other outside contractors scope of work The elevator contractor however is responsible for arrangements for their scope of work.
Sub-Bidding
Water / Sewer
$200,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 6, 2026
February 5, 2026
1441 Lake Rd, Lake Forest, IL
Related To This Project
Lake Forest, IL
Bid Date: Jan 06 2026
Lake Forest, IL
Bid Date: Dec 02 2025
Lake Forest, IL
Bid Date: Dec 03 2025
Lake Forest, IL
Bid Date: Dec 01 2025
Lake Forest, IL
Bid Date: Dec 08 2021
Lake Forest, IL
Bid Date: Apr 26 2019
Lake Forest, IL
Bid Date: Mar 27 2019
Lake Forest, IL
Bid Date: Apr 28 2021
Lake Forest, IL
Bid Date: Oct 27 2025
Lake Forest, IL
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
