Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 19, 2026 at 7:00 PM
Updated January 20, 2026
Renovation of a residential development in North Ogden, Utah. Completed plans call for the renovation of a residential development.
Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project. The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the referenced project. Improvement to the VA Home Air Quality. Questions Due Date: Dec 30th 2025, 3:00 PM MST : Online portal. The project described herein is the Ogden VA Home Air Quality Improvement project. This work shall include all labor, materials, equipment, fixtures, and devices for the entire mechanical work and a complete operating and tested installation as required for this project. A. Submission of Operating and Maintenance Manuals complete with Balancing reports. B. Coordination of work required for system commissioning. C. Provide a hard copy and an electronic copy on CD of the O and M manual fully searchable in PDF format. A. The contractor is to integrate into the existing Facility Management and Control System (FMCS) Contractor and shall fully integrate into building automation system, incorporating direct digital control (DDC) for energy management, equipment monitoring and control as herein specified. The system shall include all required hardware, controllers, sensors, transmission equipment, system workstations, local panels, conduit, wire, installation, engineering, database and setup, supervision, commissioning, acceptance test, training, warranty service and, at the owner's option, extended warranty service. Include all upgrades for a period of two years. B. The system shall only employ BACnet or Lontalk communications in an open architecture with the capabilities to support a multi-vendor environment. The software package shall be sold and promoted by at least three independent controls manufacturers. It shall include the provisions to load and execute the toolsets of each of the three manufacturers including commissioning, configuring and programming of each manufacturer's equipment. The system shall be capable of integrating third party systems and utilizing the following standard protocols. 1. BACnet communication according to ASHRAE standard ANSI/ASHRAE 135-2024. 2. OPC server communications according to OPC Data Access 2.0 and Alarms and Events 1.0. 3. LonWorks communication using LonTalk protocol. 4. Modbus communication for integration to third party devices. C. The FMCS shall be web based and shall provide total integration of the facility infrastructure systems with user access to all system data either locally over a secure Intranet within the building or by remote access by a standard Web Browser over the Internet. D. The FMCS shall demonstrate, with (3) proof sources, integration with HVAC industry open standard protocols, including LonMark, BACnet, ModBus, OPC and Internet standard SQL database and HTTP / HTML / XML text formats. E. The FMCS shall communicate to third party systems on this project including VFD's, boilers, air handling systems, transfer switches, fire-life safety systems and other building management related devices using any of the open, interoperable communication protocols referenced in Paragraph D. F. All materials and equipment used shall be standard components, regularly manufactured with standard part numbers and owners manuals for this and/or other systems. One of a kind, third party or custom integrations devices designed specially for this project will not be allowed. A. It is the intent of this specification to set the minimum acceptable requirements for the design, construction, installation, commissioning and vendor support requirements for the VFD systems herein specified. B. The VFD installation and associated equipment coordination and interface shall be provided by the ATC contractor. Mounting VFD and connecting 4-20mA control signal shall be by the ATC contractor. Power wiring to and from the VFD to the motor shall be by Division 26.
Award
Residential Subdivision
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 9, 2026
February 9, 2026
1102 S 1200 W, North Ogden, UT
Related To This Project
North Ogden, UT
Bid Date: Jan 22 2026
North Ogden, UT
Bid Date: Feb 19 2026
North Ogden, UT
Bid Date: Jan 29 2026
North Ogden, UT
Bid Date: Feb 17 2026
North Ogden, UT
Bid Date: Feb 26 2026
North Ogden, UT
Bid Date: Feb 19 2026
North Ogden, UT
Bid Date: Feb 26 2026
North Ogden, UT
--
North Ogden, UT
Bid Date: Jan 06 2026
North Ogden, UT
--
North Ogden, UT
--
North Ogden, UT
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
