BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 16, 2025 at 7:00 PM

Updated December 17, 2025

Renovation of a communication facility in La Porte, Texas. Working plans call for the renovation of a communication facility.

**As of December 16, 2025 project has been canceled. As of this time it is unknown if when project will rebid. Cancellation Description Solicitation cancelled due to changes. Provide all labor, materials, and equipment necessary to remove the current Bard wall mounted air conditioner and heater unit and replace it with a new 2-3-ton Bard air conditioner and heater or equivalent equipment. All new equipment must be compatible with the currently installed Bard dual AC and heat controller or be installed with a new dual controller. All work must be completed in accordance with the scope of work. Prior to submitting a quote, bidders must examine the scope of work and are highly recommended to visit the facility to take field measurements, conduct evaluations, and become familiar with existing conditions. This is a Small Business Set-aside and will result in a Firm-Fixed Price Construction Contract awarded to the offeror with the lowest price. Offerors must be actively registered in the System for Award Management (SAM.gov). Bidders are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance. This is a combined synopsis/solicitation to provide all labor, materials, and equipment necessary to remove the current Bard wall mounted air conditioner and heater unit and replace it with a new 2-3-ton Bard air conditioner and heater or equivalent equipment. All new equipment must be compatible with currently installed Bard dual AC and heat controller or be installed with new dual controller. All work is to be completed in accordance with the scope of work. The Contractor to supply all plant, labor, materials, and equipment: o All materials, supplies, and equipment (MSE) must be new. The Contractor shall not reuse any existing MSE, unless directed to by the SOW. o Contractor shall provide supervision to ensure United States Coast Guard Standards are met for Quality and Safety o Contractor shall maintain a clean working area. o Contractor shall protect adjacent areas during the repairs/replacement. o Contractor shall provide signage to clearly indicate the area with work in progress. o Contractor shall remove and dispose of any trash or items not to be re-used. o Contractor shall ensure AC's units are electrically and mechanically isolated. o Contractor shall remove/ disconnect all existing interferences to allow removal of current air conditioning unit and installation of new air conditioning unit. o Contractor shall install new air conditioning units and controllers / reconnect interferences as necessary for operation of unit and building functions. o Upon installation of equipment, contractor shall complete a system check and test run in the presence of Facilities Engineering personnel ensuring newly installed air conditioning units operate correctly and within parameters.

Final Planning

Communication

$10,000,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
4
Bidding Soon
2,223
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2026

June 16, 2026

Project location map

2300 Tidal Rd, La Porte, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.