BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 12, 2026 at 7:00 PM

Updated January 13, 2026

Site work and paving for a bridge / tunnel in Rifle, Colorado. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Reference Number 0000406894 BID SCHEDULE PHASE 2: Consists of constructing the prestressed concrete girder bridge, asphalt roadway and sidewalk connecting to existing Phase 1 of Park Ave (to the south) Park Ave southern waterline extension and concrete trail. All tree removal is included in Phase 2. Questions are submitted online No PROJECT DESCRIPTION - The project is divided into two phases. a. Phase 2: Consists of constructing the prestressed concrete girder bridge, asphalt roadway and sidewalk connecting to existing Phase 1 of Park Ave (to the south), Park Ave waterline extension and concrete trail. b. Phase 3: Consists of asphalt roadway, concrete sidewalk and utility (waterline, sanitary sewer, storm sewer) work on Park Ave (continuing from the end of Phase 2), 2nd Street and 3rd Street. All questions about the meaning or intent of the Contract Documents are to be directed to Engineer. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than five (5) days prior to the date of opening of Bids may not be answered.

Post-Bid

Bridges / Tunnels

$500,000.00

Public - City

Paving, Site Work

127

11

2

3

Subscribe For Documents

82 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
21
Bidding Soon
190
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2026

February 2, 2026

Project location map

Park Ave, Rifle, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.