BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2026 at 8:00 PM

Updated March 21, 2026

Demolition, site work, renovation and addition to an educational facility in Glen Ellyn, Illinois. Completed plans call for the addition of a one-story above grade educational facility; two-story above grade educational facility; and four-story above grade educational facility.

Lump sum proposals are requested from contractors for a Classroom & Learning Commons Addition and 2026/2027 Renovations at Glenbard West High School. The addition includes a four-story classroom wing and a two-story learning commons, constructed on the north side of the existing school. Foundation work involves the installation of rammed aggregate piers, frost walls, and footings for the learning commons, and full-height foundation walls for the 100 level of the building. Interior renovation for the summers of 2026 and 2027 will refresh science classrooms, general-purpose classrooms, student services, restrooms, and administration areas. Additional civil upgrades include renovation of an existing entrance and a new staircase from Crescent to enhance campus accessibility. Bid packages include, but are not limited to: demolition, building concrete, masonry, structural steel, miscellaneous metals, general carpentry, millwork and casework, laboratory casework, roofing, spray fireproofing and insulation, glass and glazing, framing/drywall/acoustics, paint and wall coverings, carpet and resilient flooring, ceramic and porcelain tile, food service equipment, stage rigging, theatre seating, conveying equipment, theatrical lighting and systems, site demolition/earthwork/utilities, rammed aggregate piers, site concrete and paving, and landscaping. Instructions to Bidders: - Bidding will occur through Procore Bidding. - Current qualifications must be submitted via COMPASS at https://compass-app.com/auth/register. - Bid security in the form of a bid bond equal to 10% of the base bid is required. - Guarantee bonds in the form of 100% performance and labor/material payment bonds may be required from the awarded bidder. - All work must comply with the Illinois Prevailing Wage Act. - Failure to comply with these requirements will result in disqualification. - Bids from non-prequalified bidders will be returned unopened. - The Glenbard Township High School District 87 and Gilbane Building Company reserve the right to reject any or all bids. All information submitted will be considered public unless specifically disclosed otherwise.

Bid Results

Educational

$27,821,005.00

Public - County

Addition, Demolition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
3
Bidding Soon
2,183
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2026

March 1, 2026

Project location map

670 Crescent Blvd, Glen Ellyn, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.