BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2026 at 7:00 PM

Updated February 12, 2026

Site work and paving for a civil project in Carrollton, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

**As of February 11th, 2026, the project was awarded to Axis Contracting, Inc, with an awarded amount of $5,788,121.70** The project consists of approximately 20,200 SY of pavement replacement, approximately 3,400 linear feet of 16-inch water line, sanitary sewer, and storm sewer improvements, and approximately 50 linear feet of underground water line installation within the railroad right-of-way. Within three months after issuance of the Notice to Proceed, the contractor is required to obtain all railroad insurance required for work within the railroad right-of-way, obtain a Right of Entry from Union Pacific Railroad and Genesee & Wyoming Railroad, and execute and secure all railroad utility construction agreements necessary for project activities. The contractor is responsible for coordinating with the railroads and arranging and paying for railroad flaggers and protection services. Vendors should not contact anyone other than Engineering regarding questions related to the proposal process. Question Deadline 01/07/2026 at 5:00 PM CT Pre-bid questions may be submitted electronically. For the purposes of this contract, the Owner's Representative (Engineer) is: Tingting Ren, PE Senior Engineer/Project Manager Engineering Department City of Carrollton, Texas 1945 E. Jackson Carrollton, Texas 972-466-4702 (o) 469-381-4109 (m) tingting.ren@cityofcarrollton.com All questions, correspondence, change order requests and other communication related to the project shall be directed to and by the Owners Representative in writing only. This project will generally include all construction, labor, materials, testing, services, administration, and associated activities required in conjunction with or properly incidental necessary for the following: o Improvement limits are along Country Club Drive from Josey Lane to Kelley Boulevard. o Replacement of existing 3,900 LF of roadway including pavement, curb, median, and sidewalks. o Replacement of approximately 3,400 LF of water line along Country Club Drive from Josey Lane to Kelly Boulevard. o Replacement of approximately 300 LF of 8-inch sanitary water line along Country Club Drive from Josey Lane to Kelley Boulevard. o Replacement of approximately 1002 LF of storm drainage line Within three (3) months after issuance of the Notice to Proceed (NTP), the Contractor shall: 1. Obtain all Railroad Insurance required for work within railroad right-of-way; and 2. Obtain a Right of Entry (ROE) from Union Pacific Railroad (UPRR), Genesee & Wyoming Railroad (GWRR). 3. Execute and secure all railroad utility construction agreements necessary for project activities.

Award

Roads / Highways

$5,788,122.00

Public - City

Paving, Site Work

128

21

18

3

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
401
Active Projects
198
Bidding Soon
3,756
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2026

March 16, 2026

Project location map

Country Club Dr, Carrollton, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.