BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 27, 2026 at 7:00 PM

Updated January 31, 2026

Site work for a road / highway in Armstrong, British Columbia. Completed plans call for site work for a road / highway.

The purpose of this RFP is to invite Proposals from qualified Proponents to provide CARI Phase 1 (Reconstruction of Pleasant Valley Boulevard North between Okanagan Street and Mill Steet). The Work can be briefly summarized as follows and supported by Attachments #1- #4: Over-excavation of organics and unsuitable subgrade, backfilled with imported granular materials. Removal of existing trees. Full road reconstruction between Okanagan Street (west) and Mill Street (east), including new granular road structure and asphalt paving. Construction of concrete curb and gutter, sidewalks, and designated paver hardscape areas. Installation of new street lighting, street signage, and pavement markings. Replacement of the storm sewer system, including manholes, catch basins, and leads. Provisional undergrounding of BC Hydro and telecommunications utilities at the west and east ends of the corridor. Landscaping and design-build supply of an irrigation system to support landscaped areas and street furniture. Installation of Fencing parallel to the CN Rail Corridor. Documents can be obtained from https://pryceadvisory.bonfirehub.ca/opportunities/100770 Question Deadline 01/23/2026 at 4:00 PM PT

Post-Bid

Roads / Highways

$1,000,000.00

Public - City

Site Work

33

16

6

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2026

March 1, 2026

Project location map

3535 Bridge St, Armstrong, BC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.