BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 14, 2026 at 7:00 PM

Updated January 15, 2026

Site work and paving for a mixed-use development in Cartersville, Georgia. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The City of Cartersville is soliciting proposals from design-build firms to design and construct the Walnut Grove Trail Reroute behind the Cartersville Water Treatment Plant. The project is to include 8-feet wide, 5-foot thick concrete trail with approximately 2,010-feet long, along with a footbridge across Pettit Creek. Trail will maintain a 75-foot buffer from the creek. Footbridge will consist of 60-foot x 8-feet wide timber boardwalk with HDPE decking and concrete abutments. Project will include all clearing, grading and finishing work with erosion control. Deadline for questions about the Statements of Qualifications: 1/2/26 at 5:00 PM. David can be reached at 770-607-6172 or darcherjr@cartersvillega.gov. Cartersville Parks & Recreation Department 100 Pine Grove Road Cartersville, GA 30120 The City of Cartersville is soliciting proposals from design-build firms to design and construct the Walnut Grove Trail Reroute behind the Cartersville Water Treatment Plant. The project is to include 8-feet wide, 5-foot thick concrete trail with approximately 2,010-feet long, along with a footbridge across Pettit Creek. Trail will maintain a 75-foot buffer from the creek. Footbridge will consist of 60-foot x 8-feet wide timber boardwalk with HDPE decking and concrete abutments. Project will include all clearing, grading and finishing work with erosion control. Our future trail will be located in the floodplain and a bridge will be required to cross- over a floodway. This will need to be addressed and permitted correctly. The project and bridge installation will need to meet the requirements found in Chapter 7.5 Development Regulations of our Municode. Article VI of this chapter is our Floodplain Management/Flood Damage Prevention Ordinance. All items regarding the floodplain/floodway can be found in this section. However, other items such as general design, soil erosion and pollution control, stream buffers and post-construction stormwater management are found in varying articles within Chapter 7.5. I think it would be a good idea to put text that addresses that all work and design are to meet the requirements found in Chapter 7.5 of our Municode. For Floodway requirements with a bridge, see the section below found in Article VI: (e) Floodway encroachments. Located within areas of special flood hazard are areas designated as floodway. A floodway may be an extremely hazardous area due to velocity floodwaters, debris or erosion potential. In addition, floodways must remain free of encroachment in order to allow for the discharge of the base flood without increased flood heights. Therefore, the following provisions shall apply: (1) Encroachments are prohibited, including earthen fill, new construction, substantial improvements or other development within the regulatory floodway, except for activities specifically allowed in subsection (e)(2) below; (2) Encroachments for bridges, culverts, roadways and utilities within the regulatory floodway may be permitted provided it is demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the encroachment will not result in any increase to the pre-project base flood elevations, floodway elevations, or floodway widths during the base flood discharge. A licensed professional engineer must provide supporting technical data and certification thereof; (3) If the applicant proposes to revise the floodway boundaries, no permit authorizing the encroachment into or an alteration of the floodway shall be issued by the City of Cartersville until an affirmative conditional letter of map revision (CLOMR) is issued by FEMA or a no-rise certification is approved by the City of Cartersville.

Post-Bid

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
285
Active Projects
131
Bidding Soon
1,910
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2026

May 13, 2026

Project location map

Multiple Locations, Cartersville, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.