Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 9, 2026 at 7:00 PM
Updated February 21, 2026
Demolition, site work and paving for a bridge / tunnel in Cartersville, Georgia. Completed plans call for the demolition of a bridge / tunnel.
Bartow County will accept sealed bids for the rehabilitation of two existing bridges located on Cassville White Road. The project consists of rehabilitating two undersized bridges with substandard widths near the I-75 Interchange, by replacing the superstructures only with a proprietary Sandwich Plate System (SPS) superstructure tied to new wide flange beams. The substructure of the easternmost bridge will require minor modifications including new wing walls and caps on all four corners. Additional work includes minor ancillary road and pavement construction such as guardrails, markings, signage, debris removal, and additional pavement widths for approximately 250 feet on both sides of both bridges. The work must be completed within a 92-day summer timeline upon receipt of a Notice to Proceed. Each bid must include a Bid Bond of 5% of the bid amount. Both a Performance Bond (100% of contract price) and a Payment Bond (110% of the Performance Bond) are required. Proof of General Liability and Worker's Compensation Insurance is required with Bartow County as an additional insured. Bidders must be prequalified contractors or registered subcontractors with GDOT. All contractors and subcontractors must comply with nondiscrimination, legal employment verification, and supply chain requirements as specified. All required affidavits and forms must be submitted with the bid. Submission instructions specify that all blanks on the Proposal must be correctly filled for each Pay Item, and calculations must adhere to the stated rules. Bids may not be withdrawn for 60 days after opening. Bartow County reserves the right to reject any or all bids and waive technicalities or informalities. The work shall be completed within the May 1-July 31 timeline. The successful bidder must meet the summer timeline of 92 days to complete the work upon receipt of a Notice to Proceed to Construction from the Project Sponsor Question Deadline 01/28/2026 at 5:00 PM ET All questions concerning this RFB must be submitted in writing to amoss@bartowcountyga.gov. No questions other than written will be accepted. No response other than written will be binding upon the County.
Post-Bid
Bridges / Tunnels
$1,000,000.00
Public - County
Demolition, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 20, 2026
May 1, 2026
Cassville White Rd, Cartersville, GA
Related To This Project
Cartersville, GA
Bid Date: Mar 03 2026
Cartersville, GA
Bid Date: Mar 19 2026
Cartersville, GA
Bid Date: Mar 20 2026
Cartersville, GA
Bid Date: Mar 20 2026
Cartersville, GA
Bid Date: Jan 05 2026
Cartersville, GA
Bid Date: Jan 05 2026
Cartersville, GA
Bid Date: Jan 13 2026
Cartersville, GA
Bid Date: Dec 15 2025
Cartersville, GA
Bid Date: Jan 07 2026
Cartersville, GA
--
Cartersville, GA
Bid Date: Dec 09 2025
Cartersville, GA
Bid Date: Nov 26 2025
Cartersville, GA
--
Cartersville, GA
Bid Date: Nov 18 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
