Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 5, 2026 at 7:00 PM
Updated March 6, 2026
Renovation of a municipal facility in Madison, Wisconsin. Completed plans call for the renovation of a municipal facility.
In general, the work consists of:a comprehensive sealant joint replacement (masonry and fenestration) and cleaning across all exterior building surfaces. Secondary scope of work includes localized brick replacement, widening of masonry movement joints, and steel (lintels and door/frames) refinishing. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. The application of the 5% permissive bidding preference pursuant to Wis. Stat. 16.855(10m)(am)3. for certified minority businesses is currently paused. Bid date notes: Hand delivery to the drop box labeled SEALED BIDS ONLY in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703.
Award
Municipal
$238,346.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 27, 2026
May 11, 2026
2811 Agriculture Dr, Madison, WI
Related To This Project
Madison, WI
Bid Date: Feb 03 2026
Madison, WI
Bid Date: Feb 03 2026
Madison, WI
Bid Date: Jan 15 2026
Madison, WI
Bid Date: Jan 27 2026
Madison, WI
--
Madison, WI
--
Madison, WI
Bid Date: Feb 12 2026
Madison, WI
Bid Date: Jan 13 2026
Madison, WI
Bid Date: Jan 06 2026
Madison, WI
Bid Date: Dec 29 2025
Madison, WI
Bid Date: Jan 20 2026
Madison, WI
Bid Date: Jan 08 2026
Madison, WI
Bid Date: Jan 09 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
