BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 27, 2026 at 7:00 PM

Updated February 28, 2026

Renovation of a water / sewer project in Madison, Wisconsin. Completed plans call for the renovation of a water / sewer project.

REBID - Water Treatment System Improvements - In general, the work consists of: removal of existing water treatment equipment and installation of new water treatment equipment at four buildings on the Old World Wisconsin Campus, including piping additions, yard piping, and surface restoration. online Bid Opening :- The conference line will be open at 1:45 P.M. CDT and all bids will be opened after 2:00 P.M. CDT. tram building water treatment room 1. remove existing water softener and brine tank 2. see treatment schematic - appendix a for additional details 3. uv disinfection - final stage of treatment 4. hose bibbs to remain untreated 5. install gfci quadplex outlet box 48" above finished floor, tie into existing electrical panel. add 15-amp breaker in electrical panel, match existing. 6. place brine tank in front of water softener 7. place oxidant tank in front of filter 8. replace piping and valves as shown and needed to install treatment equipment. 9. new piping to be insulated copper tram building water treatment room - removals note: 1. remove existing water softener and brine tank 2. remove piping and valves as noted proposed tram washing station yard piping - approximate location a. remove 4 ft x 6 ft concrete slab to access piping b. install new piping from tram building water treatment room along existing interior wall, down through existing floor and concrete footing c. install new curb stop valve on existing line in between raw water and treated water connection d. replace concrete slab, repair and restore turf, gravel and concrete slabs, and patch interior concrete floor e. insulate interior piping collections building water treatment room note: 1. remove existing iron filter, water softener and brine tank 2. see treatment schematic - appendix a for additional details 3. replace all piping and valves between the pressure tank and water softener discharge, 3/4" copper 4. install new 3/4" water meter 5. uv disinfection - final stage of treatment after softening 6. install two gfci duplex outlet boxes at 48" above finished floor, one by softening and one by iron filtration, tie into existing electrical panel. add 15-amp breaker in electrical panel, match existing. 7. place brine tank in front of water softener 8. place oxidant tank next to filter 9. do not run piping in front of the electrical panel 10. new piping to be insulated copper

Bid Results

Water / Sewer

$118,200.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
347
Active Projects
186
Bidding Soon
1,993
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2026

April 1, 2026

Project location map

Multiple Locations, Madison, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.