Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 5, 2026 at 7:00 PM
Updated February 6, 2026
Renovation of a municipal facility in Madison, Wisconsin. Completed plans call for the renovation of a municipal facility.
In general, the work consists of: Interior renovation to 5,800 square feet on the 7th Floor north and south wings of the building. Work includes demolition of drywall partitions with doors and hollow metal frames, removal and reinstallation of plastic laminate casework with modifications, acoustic ceiling system modifications to accommodate new layout and access work above ceiling. Partitions are metal stud and drywall with wood doors in hollow metal frames with glass lites. Finish work includes wall base, carpet tiles, corner guards, casework modifications, and ceiling tiles. Electrical removal and installation of power and data sensors to accommodate renovation layout. Ceiling work includes removal and reinstallation or new light fixtures, exit lights, occupancy sensors, fire alarms, smoke detectors. Mechanical work includes duct and piping modifications, new VAVs equipment, relocation or new supply diffusers and return grilles. Fire protection work is piping modifications, removal and relocation of sprinkler heads, new sprinkler heads to accommodate renovation layout. Owner to send to capitol police department (CPD). CPD to place core order, receive cores, install cores, and key. 3. HVAC controls and programming by owner. Refer to mechanical sheet M300 for responsibility notes. 4. Card access device provided by owner and turned over to contractor for installation. Refer to electrical for locations 5. Owner to provide the vinyl wall base material only and turn over to contractor. Contractor to install. To install wall base. Contractor to provide adhesive. Contractor to modify wall base at new partitions intersections. 6. Owner to provide and install paint primer and finish painting of partitions, soffits, and hollow metal frames. contractor to sand and prep new partitions, partition intersections, patched partitions, and partition mullion 6 termination ready for paint finish. Please direct all project specific questions to DFD Project Manager Adam Rittel at 608-261-7420 or adam.rittel@wisconsin.gov. Start & End Date April 2026 - July 2026 Bidders shall bring inadequacies, omissions or conflicts to the Architect/Engineer's attention at least 40 ten (10) days before the date set for bid opening
Bid Results
Municipal
$377,974.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 27, 2026
April 1, 2026
4822 Madison Yards Way, Madison, WI
Related To This Project
Madison, WI
--
Madison, WI
--
Madison, WI
--
Madison, WI
--
Madison, WI
--
Madison, WI
Bid Date: Feb 12 2026
Madison, WI
Bid Date: Jan 15 2026
Madison, WI
Bid Date: Feb 03 2026
Madison, WI
Bid Date: Feb 03 2026
Madison, WI
--
Madison, WI
Bid Date: Jan 27 2026
Madison, WI
Bid Date: Jan 13 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
