BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2026 at 7:00 PM

Updated January 24, 2026

Site work for a water / sewer project in Wapakoneta, Ohio. Completed plans call for site work for a water / sewer project.

As of January 23, 2026, this project has not yet been awarded. A timeline for the award has not yet been established. The project involves the site development and installation of a new water tower in Wapakoneta. Bidders are required to pay at least the minimum wage rates established by the Federal Labor Standards Provisions and Davis-Bacon Wages. Attention is drawn to various insurance requirements and equal opportunity provisions. The procurement encourages participation from small businesses in rural areas. For complete requirements related to bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders included in the Bidding Documents. The current negotiated goal for construction related activitiesis 5.4% (the total goal is based on 3.1% of MBEs and 2.3% of WBEs participation). The Work covered under this Contract shall consist of all excavation, foundation construction, backfill, construction access roadway construction, fabrication, erection, painting, disinfection, site work, site clean-up and rough grading shown on the plans and specified in these Specifications for the fabrication and erection of a 3,000,000 gallon composite elevated water tank including foundation, painting, and accessories. The above description shall serve as general information only and shall not be construed to limit the contractor's responsibility or obligation to comply with the Contract Documents and Detailed Technical Specifications. The date by which Substantial Completion must be achieved is March 31, 2028, and the date by which readiness for final payment must be achieved is April 30, 2028. Question Deadline 01/02/2026 Bidder must submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Email Project Manager, (Jacob L. Bertke), (jlb@choiceoneengineering.com). If no response within 24 hours call (513-239-8554). Questions received less than 4 days prior to the date for opening of Bids may not be answered. THIS PROJECT CONSISTS OF THE SITE DEVELOPMENT AND INSTALLATION OF A NEW WATER TOWER IN WAPAKONETA.

Bid Results

Water / Sewer

$9,958,000.00

Public - City

Site Work

16

21

12

6

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
349
Active Projects
232
Bidding Soon
2,222
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2026

March 16, 2026

Project location map

To be determined, Wapakoneta, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.