BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 8, 2026 at 7:00 PM

Updated January 9, 2026

Demolition, site work, paving and new construction of a mixed-use development in Winston Salem, North Carolina. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project is federally funded and has been assigned the STIP # HM-0004 by NCDOT. The Old Greensboro Rd Bridge (STR #330330) over Bushy Fork Creek consists of a simple two span structure with reinforced concrete abutments, a reinforced concrete interior bent with a reinforced concrete solid pier, and a reinforced concrete bridge deck over I-Beams. The bridge was inspected on May 8th, 2024, and was determined to be structurally deficient and has reached its end-of-life cycle. The bridge inspection report indicated that the bridge has severe concrete cracking, concrete delamination/spalling, corrosion, and the bridge weight rating for vehicles is restricted to 11 Tons for a Single Vehicle and 15 Tons for a Truck Tractor Semitrailer. The bridge is located within City of Winston Salem city limits, approximately 0.1 miles from the intersection of Old Greensboro Rd and E. 5th Street. The Old Greensboro Rd Bridge over Bushy Fork Creek (HM-0004) project will provide civil and roadway design services for a new bridge. The typical section of the new bridge shall consist of two 12 lanes of travel for vehicles, two 5 bicycle lanes, a 2 buffer between the vehicle and bicycle lanes, two 6 sidewalks with curb, and a black two-bar metal barrier rail. The project will include civil design services for the new bridge to accommodate the passage of the Brushy Fork Greenway underneath while meeting all ADA requirements. The project deliverables shall include utility-make-ready and traffic control plans to facilitate the construction of the bridge replacement. All questions concerning this RFQ/LOI or the scope of work should be submitted in writing to Catherine Knisley, Construction Specialist Purchaser at catherinek@cityofws.org by the End of Question period of 12:00pm, January 14, 2026. NCDOT - RFP Engineering - Replacement of the Old Greensboro Rd

Conceptual

Bridges / Tunnels

$2,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
109
Bidding Soon
2,153
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2026

Project location map

Old Greensboro Rd, Winston Salem, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.