BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 15, 2026 at 7:00 PM

Updated January 16, 2026

Renovation of a multi-residential development in Mobile, Alabama. Completed plans call for the renovation of a multi-residential development.

Roof Replacement at 562 Tuttle Avenue under the Critical Repair Program for the City of Mobiles Department of Community and Housing Development. If you have any questions, you can email Ginny Kirby at ginny.kirby@cityofmobile.gov. Areas that are found to be spaced decked shall be covered with _" exterior grade sheathing material after removing the existing decking . It is the contractors responsibility to ensure the framing and structure will support the additional load . Remove existing roofing materials down to bare decking . Check all roof trusses /rafters and repair /replace as needed to ensure that new roof structure is flat and smooth without rises or depressions in roof system . Replace all rotten , broken , un-even , weak , or deteriorated supporting roofing decking system such as rafter tails , facia and etc. 0 framing ; including Any exposed repaired or replace wood should be protected from the elements , painted to match existing color . Replaced /repaired decking shall be level and ready to accept felt and shingles . Check all roof trusses for strength and stability before re-shingling house . Remove all unused elements , vents , etc., that are not operational and close them below roof level . Re-flash all valleys , vents , roof openings , and chimneys . Install new boots around all roof penetrations . Haul away debris immediately . Use a magnetic sweep around the perimeter of house and rake away any other debris . Cover synthetic entire roof decking with or 15# asphalt impregnated self-adhered roofing felt underlayment Prepare roof decking to accept a ridge vent . Starter shingles must be self-adhered . underlayment . then install Re-roof with a 30year dimensional class A fiberglass asphalt shingle . (Owners choice of color ) (any area deemed to need roll roofing material will be self adhering modified bitumen ) cap sheet and (base sheet if needed ) install proper metal drip rail for this style roofing . Contractor must provide shingle color sample to homeowner prior to material delivery . Shingles must be 1stquality still in the wrapper . Seconds will not be accepted. Install drip rail around perimeter of house. Shingles shall have _" to 1 _" overhang . Install roof over ridge vent with-in 2ft of end of ridge (end to end). New roof shall be structurally sound and leak free , including at any attached structures that are adjoined to roof . Contractor shall warrant the roof to be completely leak free for one year

Post-Bid

Multi-Residential

$20,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
59
Bidding Soon
749
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2026

February 6, 2026

Project location map

562 Tuttle Ave, Mobile, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.