BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2026 at 7:00 PM

Updated January 24, 2026

Site work and paving for a road / highway in Muldrow, Oklahoma. Completed plans call for site work for a road / highway; and for paving for a road / highway.

SH-64b: From the US-64 Jct, Extend North Near Muldrow. Project Length = 4.85 Miles. Calendar Days: 30 Days Question Deadline 01/02/2026. Please submit your questions through the ODOT pre-bid email address: ODOT-Prebid.Question@odot.org. OKDOT - 835 - Resurface (Asphalt) - SH-64B This work consists of providing electronic data for material weight tickets of all bituminous material delivered to the project. This work also consists of placing an identifying vehicle number on the driver side and the passenger or rear sides of the delivery vehicle. These provisions do not preclude or dismiss any requirement for paper tickets required by the Standard Specifications or other rules and regulations. A. General The American Burying Beetle (ABB) is listed by the U.S. Fish and Wildlife Service (USFWS) as a threatened species. As such, the ABB is protected under the Endangered Species Act (the Act), which prohibits any take that may interfere with the survival and recovery of the species. A final rule under the authority of section 4(d) of the Act provides measures that are necessary and advisable to provide for the conservation of the American burying beetle. The 4(d) rule identifies certain activities that are excepted from take prohibitions, which differs by geographic area. FHWA delegatesthe ODOT Natural Resources Program biologiststo assessimpactsto species and to determine when application of the 4(d) rule for ABB is appropriate. Artificial lighting is known to disturb nocturnal insects' essential activities, including migration, dispersal, foraging, mating, and reproduction. For any federally funded projects let through ODOT within suitable ABB habitat, measures will be taken to minimize use of artificial lighting during construction. If night construction is necessary, direct light will be shielded to the work area and light will be prevented from projecting upwards. B. Contract Administration For projects where the 4(d) rule for ABB applies, artificial lighting may be used during construction for night activities if the equipment specifications in Subsection 656.03 of this Special Provision are adhered to and measures to minimize use of artificial lighting have been implemented. This work consists of providing and placing reflectorized and non-reflectorized plural-component pavement markings on asphalt concrete (AC) and portland cement concrete (PCC) pavement surfaces. Plural-component pavement markings includes multiple varieties of both fast setting and slow setting hybridized epoxies, modified urethanes/polyacrylates, methylmethacrylates(MMA), polyurea, or any other applicable plural-component materials approved by the Department. Contractor to perform mill, overlay, replace existing pavement markings, and provide traffic control on railroad property. Railroad approved third party flagging contractor service to be provided for the entire duration of work and/or TCP through Railroad Property.

Post-Bid

Roads / Highways

$2,000,000.00

Public - State/Provincial

Paving, Site Work

3

8

2

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
88
Bidding Soon
761
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2026

June 1, 2026

Project location map

OK-64B, Muldrow, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.