BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 18, 2025 at 7:00 PM

Updated December 19, 2025

Demolition, site work and new construction of a mixed-use development in Princeton, Massachusetts. Completed plans call for the demolition of a fire / police facility; for the construction of a fire / police facility; for site work for a fire / police facility; fitness / recreation center; municipal facility; parking garage; service station / car wash facility; water / sewer project; and 14,000-square-foot parking garage.

Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Request for General and Trade Contractor Qualifications for the Princeton Public Safety project. The Town of Princeton is replacing its main Fire Station and its Police Station with a new, combined, public safety building that is to be built on the site of a former school that is slated for demolition before this construction begins. The new approximately 14,000 sf building consists of two stories with vehicle bays, garage, holding cells, administration area, dispatch center, fitness center and offices. There are no public utilities so the new site will need a well water system, a septic system, fire suppression water storage tank and PFAS remediation system. Estimated total project duration is 16 months. Sub Bid Category : Masonry, Misc. Metals, WD&C, Roofing & Flashing, Glass & Glazing, Tile, ACT, Resilient Floors, Painting, Fire Protect, Plumbg, HVAC, & Electrical. Additional Information Trade Contractor Statement of Qualifications Forms from interested trade subcontractors are sought for the following categories of work: Masonry (ECC $99,000), Miscellaneous & Ornamental Iron (ECC $121,000), Waterproofing, Dampproofing & Caulking (ECC $40,000), Roofing & Flashing (ECC $280,000), Glass & Glazing (ECC $40,000), Tile (ECC $86,000), Acoustical Ceiling Tile (ECC $45,000), Resilient Floors (ECC $69,000), Painting (ECC $112,000), Fire Protection ($900,000), Plumbing (ECC $675,000), HVAC (ECC $1,538,000), Electrical (ECC $1,714,000). Only prequalified General and Trade firms, who are prequalified by the Awarding Authority, will be invited to submit a bid for the Building Project pursuant to M.G.L. c. 149, 44E. The Owner's Project Manager is The Vertex Companies, LLC. and the Project Designer is Caolo & Bieniek Associates.

GC Bidding

Fire / Police

$5,719,000.00

Public - City

Demolition, New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
602
Active Projects
126
Bidding Soon
4,619
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2026

March 9, 2026

Project location map

To Be Determined, Princeton, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.