BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 18, 2025 at 7:00 PM

Updated December 19, 2025

Site work for a playground / park / athletic field in Key Biscayne, Florida. Completed plans call for site work for a playground / park / athletic field.

New turf installation, turf removal, base repair, turf reinstallation, and bonded rubber mulch installation within designated areas of the dog park. Work includes removal of existing synthetic turf where root intrusion has occurred, preparing the base for proper installation, reinstalling existing turf, and installing bonded rubber mulch around specific tree ring areas. Contractor shall provide all necessary labor, materials, and equipment for renovation. Question Deadline 01/12/2026 at 9:00 AM ET Any and all questions or requests for information or clarification pertaining to this solicitation must be made in writing via email to procurement@keybiscayne.fl.gov 2.2 DETAILED SCOPE OF WORK 2.2.1 Turf Installation, Removal and Reinstallation i. Install approximately 150 Sq. Ft. of new artificial turf with a concrete boarder on three (3) sides and glue perimeter edging to the new and existing border. ii. Remove existing synthetic turf in all areas where roots have caused lifting or surface distortion. iii. Root removal to be performed by the selected contractor. iv. Prepare sub-base including: a. Up to 2 inches of crushed aggregate b. Top layer of compacted sand c. Final grading for proper leveling and drainage v. Pour new concrete border along all locations where turf was lifted to secure edges. vi. Reinstall existing synthetic turf: a. Cut and seam per manufacturer specifications b. Glue perimeter edging and seams using heavy-duty outdoor turf adhesive vii. Apply new Envirofill infill throughout both dog parks and power broom into turf fibers. 2.2.2 Bonded Rubber Mulch Installation i. Install 540 sq ft of bonded rubber mulch across nine (9) total tree rings located within the small and large dog park areas. ii. Remove existing sod and soil where necessary. iii. Excavate and grade each tree ring to accommodate: a. Up to 2 inches of crushed aggregate base iv. Install recycled rubber mulch mixed with aromatic binder in all nine (9) tree rings. v. Ensure clean, finished edges and uniform depth throughout. vi. All square footage includes waste factors. 2.3 MATERIALS i. New and existing synthetic turf (to be reused) ii. New Envirofill infill iii. Bonded rubber mulch (Rustic color) iv. Crushed aggregate and sand base materials v. Concrete for perimeter border vi. Heavy-duty outdoor turf adhesive 2.4 EXCLUSIONS i. Irrigation repairs or undisclosed utility damage ii. Site security during construction unless stated otherwise 2.5 CONTRACTOR REQUIREMENTS i. Detailed, itemized pricing ii. Village Permits (if applicable) iii. Warranty details iv. Proof of licensing and insurance v. Proposed project schedule and duration 2.6 PROJECT CONDITIONS AND COORDINATION i. Contractor shall verify all measurements prior to construction ii. Work subject to weather conditions

GC Bidding

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
105
Bidding Soon
1,621
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2026

March 11, 2026

Project location map

450 Crandon Blvd, Key Biscayne, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.