BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 24, 2026 at 8:00 PM

Updated March 25, 2026

Renovation of an educational facility in Greybull, Wyoming. Completed plans call for the renovation of a 45,600-square-foot educational facility.

*As of March 24, 2026, the project was awarded to Limmer Roofing, with an awarded amount of $304,335.13.** Greybull Elementary School Roof Replacement The Work includes the installation of approximately 42,750 SF of asphalt shingle roofing system, including asphalt shingles, ice and water barrier, underlayment, metal drip edge, and flashing. Additionally, the Work is to include the installation of approximately 2,850 SF of a nominal 45-mil to 60-mil mechanically attached or fully-adhered single-ply membrane roofing system or approved equal, a minimum 1/4 " thick cover board, and polyisocyanurate tapered insulation to create grade. Question Deadline 02/05/2026 at 2:00 PM MT Bidders and sub-bidders having questions, requiring clarification, interpretation or any RFls (Request for Information) regarding the procurement documents shall make a written request via email to Carter Baxter at Engineering Associates at carter.baxter@EAengineers.com, with a copy to Joe Forcella at jforcella@bgh3.k12.wy.us. Interpretations, corrections, and changes of the contract documents shall be made by Addendum CONSTRUCTION COSTS: $ 350,000 to $ 400,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Educational

$304,335.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
0
Bidding Soon
53
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2026

June 1, 2026

Project location map

125 6th Ave S, Greybull, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.