Site work for a water / sewer project in Adairsville, Georgia. Completed plans call for site work for a water / sewer project.
**As of March 17, 2026 this project has not yet been awarded. A timeline for the award has not yet been established.** The project includes all material, labor, and related appurtenances for rehabilitation of a gravity sewer main in Adairsville, Georgia. This project involves pressure grouting and CIPP lining of approximately 335 linear feet of 12-inch DIP gravity sewer main, in which 100 linear feet are located within CSX right-of-way. Access will be provided through two existing manholes situated outside of the CSX right-of-way. No excavation is required, as the existing sanitary sewer will be rehabilitated in place utilizing trenchless CIPP lining methods. The project will also include the rehabilitation of two existing sanitary sewer manholes. The Contractor will be responsible for providing all documentation required by CSX to obtain the necessary railroad permit for the work within the right-of-way. At a minimum, this includes: (1) a current Certificate of General Liability insurance meeting CSXs requirements; (2) Railroad Protective Liability (RPL) coverage if work occurs within 50 feet of the tracks Contractors may provide their own RPL policy or may elect to purchase CSX-issued RPL coverage for $1,250 per job location; and (3) all CIPP manufacturer design calculations required for CSX review and approval. Failure to provide complete and compliant railroad submittals may delay permit issuance and the start of work. If bid is forwarded by mail, the sealed envelope containing the Bid must be enclosed in a separate mailing envelope to the attention of the Purchasing Manager at the address previously given. Question Deadline 01/21/2026 at 12:00 PM ET Any questions or comments concerning this project should be sent in writing to the project manager, Sasha Pavluscenco, sasha@rindt.com The Contractors Affidavit for Electronic Verification of Work Authorization Programs form (E-Verify) shall be executed and submitted as part of the bid package. Contractor's Bid will be considered non-responsive without conformance to E-Verify requirements. CCTV footage of the existing sewer infiltration will be provided with the bid documents. The Owner is not obligated to consider a Bidder's proposal, if Bidder is not on record with the Issuing Office as having received complete Bidding Documents from the Issuing Office. The time allowed for Substantial Completion from the date of Notice to Proceed is 21 consecutive calendar days. The project has a maximum time for total completion which shall not exceed 30 consecutive calendar days from the starting date specified in the Notice to Proceed. Each Bid must be accompanied by a Bid Bond with good and sufficient surety or sureties approved by the Owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the Owner in an amount equivalent to five percent (5%) of the total amount payable by the terms of the Contract or, in lieu thereof, in the form of a certified check, cashier's check, or cash in equal amount. The Successful Bidder will be required to furnish performance and payment bonds with the executed Agreement meeting the requirements of the Contract Documents and executed on the forms attached to the Agreement. The terms and time for payment are set forth in the Agreement. All Bids will remain subject to acceptance for 60 days after the day of the Bid Opening, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to that date. The Owner reserves the right to reject any or all Bids, to waive formalities, and to re-advertise *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Water / Sewer
$288,828.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 13, 2026
March 17, 2026
116 Public Square, Adairsville, GA
Related To This Project
Adairsville, GA
Bid Date: Mar 06 2026
Adairsville, GA
--
Adairsville, GA
--
Adairsville, GA
--
Adairsville, GA
--
Adairsville, GA
Bid Date: Aug 08 2025
Adairsville, GA
Bid Date: Aug 14 2025
Adairsville, GA
Bid Date: Jun 20 2025
Adairsville, GA
Bid Date: May 08 2025
Adairsville, GA
Bid Date: May 01 2025
Adairsville, GA
Bid Date: Apr 14 2025
Adairsville, GA
Bid Date: Apr 11 2025
Adairsville, GA
Bid Date: Apr 08 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.