Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 22, 2026 at 7:00 PM
Updated January 23, 2026
Remodeling of an educational facility in Rancho Cucamonga, California. Completed plans call for the remodel of a educational facility.
The Work is generally described as a District-Wide Auditorium Projectors project. Chaffey Joint Union High School District is seeking a contractor to install carpet, vinyl, and rubber flooring, as well as to stain, urethane coat, polish, and seal concrete flooring as per District specifications. Project Type: Construction Engineer's Estimated Cost: 500,000.00 Project Duration: 120 Days Liquidated Damages: 1,000/day DVBE (3%) Bidders must submit Bid Proposals on forms furnished by the District and conform to the Bid and Contract Documents. Bid Proposals must include a Bid Form, Bid Security, List of Subcontractors, Non-Collusion Declaration, and Statement of Bidder's Qualifications. A mandatory pre-bid job walk is required. The project is subject to prevailing wage requirements, and all bidders and subcontractors must be registered with the California Department of Industrial Relations. Bidders must possess the appropriate California Contractors License ("C-15", "C-61", or "D-12") at the time of contract award. Bid security must be at least ten percent of the maximum bid amount. The successful bidder must ensure employees, subcontractors, material suppliers, and consultants do not have direct contact with students and must comply with relevant fingerprinting and monitoring requirements. Bids must remain valid for ninety days post-opening. The District may substitute securities for retention, reserves the right to reject any or all bids, and will award the contract to the lowest responsive bidder. Disabled Veteran Business Enterprises participation goals of three percent have been established for the work. End date- 06/29/2026 as per ITB SCOPE OF WORK: CARPET, BASE Chaffey Joint Union High School District is seeking a contractor to demo the existing carpet, VCT, rubber flooring, cove base, and transitions and install new flooring per District specifications. The contractor is to supply all necessary equipment, labor, and materials to do flooring as per Tarkett Carpet and Mannington Commercial Products specifications. The contractor is responsible for all cleanup associated with this project. The level of cleanliness should be pre-agreed upon between the responsive bidder and the district. DOORSTOPS: Doorstops shall be removed and reinstalled into their original positions by the contractor. Door thresholds must be removed carefully and replaced in their original position by the contractor. 1. Carpet a) Carpet tiles shall be Tarkett Flex-air. Style and color are listed in the specs. b) Carpet rolled goods shall be Tarkett Flex-air. Style and color are listed in the specs. c) Carpet is to be glued down using the manufacturer's recommendations. 2. Walk offmats. a) Walk offmats shall be Tarkett Abrasive Action II #02578 b) Walk offmats shall be color charcoal #19100 c) Walk offmats shall be in rolled goods form only. d) Walk offmats shall be at all doorways exiting the buildings. 3. Rubber products a) Rubber cove base shall be Mannington- BurkeBase Premium TS wall base 4" black 701. b) Rubber transition type shall be selected for application as needed, and must be black in color. c) Rubber flooring shall be Mondo Zeus 3.5mm 39 3/8" X 39 3/8" tiles. Color Dark Metal Z638 d) Rubber flooring shall be Rubber Gym Tiles - 23" x 23" x 3/8", Interlocking tiles create cushioned Color to be to be determined e) Sheet vinyl to be Mohawk Group Medella Fleck C2061 color to be determined. ALTA LOMA HIGH SCHOOL BUILDING A; ADMIN OFFICES 1. Demo existing carpet, cove base, and transitions. 2. Install Tarkett Flex-aire Style: Street Life Blue Line 36109 3. 24" X 24" carpet tiles on floor surfaces in a quarter-turn pattern. 4. Install Mannington- BurkeBase Premium TS wall base 4" black 701. 5. Install rubber transitions as needed. ALTA LOMA HIGH SCHOOL BUILDING B; ADMIN OFFICES 1. Demo existing carpet, cove base, and transitions. 2. Install Tarkett Flex-aire Style: Street Life Blue Line 36109 3. 24" X 24" carpet tiles on floor surfaces in a quarter-turn pattern. 4. Install Mannington- BurkeBase Premium TS wall base 4" black 701. 5. Install rubber transitions as needed. CHAFFEY HIGH SCHOOL BUILDING N; STUDENT STORE 1. Install Tarkett Abrasive Action II #02578 color = charcoal #19100 (2) mats 2. Southeast entrance 7'x 4' 3. Southwest entrance 6'x 4' 4. Install Mannington- BurkeBase Premium TS wall base 4" black 701. 5. Install rubber transitions as needed. EITWANDA HIGH SCHOOL D BUILDING 1. Install Rubber Gym Tiles - 23" x 23" x 3/8" Interlocking tiles. 2. Install Tarkett Abrasive Action II #02578 color = charcoal #19100 (1) mat 3. North entrance to be 6' x 5' 4. Install Mannington- BurkeBase Premium TS wall base 4" black 701. 5. Install rubber transitions as needed. CHAFFEY ADULT SCHOOL BUILDING G 1. Demo existing carpet, cove base, and transitions. 2. Install Tarkett Flex-aire Style: Geoknit Saturated Grey 42703 3. 24" X 24" carpet tiles on floor surfaces in a quarter-turn pattern. 4. Install Mondo Zeus 3.5mm 39 3/8" X 39 3/8" tiles. Dark Metal Z638 5. Install Mohawk Group sheet vinyl Medella Fleck C2061 color to be determined in both restrooms. 6. Install Tarkett Abrasive Action II #02578 color = charcoal #19100 (6) mats 7. South entrance to be 5' x 4' 8. Southeast entrance to be 5'x 4' 9. East entrance to be 5'x 4' 10. Northeast entrance to be 5'x 4' 11. Northwest entrance to be 6'x 5 12. Southwest entrance to be 6'x 5' 13. Install Mannington- BurkeBase Premium TS wall base 4" black 701. 14. Install rubber transitions as needed. ONTARIO HIGH SCHOOL BUILDING H; BOYS LOCKER ROOM 1. Install Mannington- BurkeBase Premium TS wall base 4" black 701. 2. Install rubber transitions as needed. ONTARIO HIGH SCHOOL BUILDING H; GIRLS LOCKER ROOM 1. Install Mannington- BurkeBase Premium TS wall base 4" black 701. 2. Install rubber transitions as needed. VALLEY VIEW HIGH SCHOOL BUILDING B 1. Demo existing carpet, cove base, and transitions. 2. Install Tarkett Flex-aire Style: Street Life Steelhead 36105 3. 24" X 24" carpet tiles on floor surfaces in a quarter-turn pattern. 4. Install Mondo Zeus 3.5mm 39 3/8" X 39 3/8" tiles. Dark metal Z638 5. Install Mohawk Group sheet vinyl Medella Fleck C2061 color to be determined in all rest rooms. 6. Install Tarkett Abrasive Action II #02578 color charcoal #19100 (9) mats 7. All exits and entrances to be 4'x 5' 8. Install Mannington- BurkeBase Premium TS wall base 4" black 701. 9. Install rubber transitions as needed. Q/A: It is the sole and exclusive responsibility of the Bidderto submit such request not less than five (5) days priorto the scheduled closing for the receipt of Bid Proposals.
Award
Educational
$207,784.00
Public - City
Remodeling
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
10
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 13, 2026
February 12, 2026
13500 Victoria St, Rancho Cucamonga, CA
Related To This Project
Rancho Cucamonga, CA
--
Rancho Cucamonga, CA
Bid Date: Jan 30 2026
Rancho Cucamonga, CA
Bid Date: Jan 27 2026
Rancho Cucamonga, CA
Bid Date: Feb 11 2026
Rancho Cucamonga, CA
Bid Date: Feb 10 2026
Rancho Cucamonga, CA
Bid Date: Feb 03 2026
Rancho Cucamonga, CA
Bid Date: Feb 10 2026
Rancho Cucamonga, CA
Bid Date: Feb 10 2026
Rancho Cucamonga, CA
Bid Date: Jan 16 2026
Rancho Cucamonga, CA
Bid Date: Dec 22 2025
Rancho Cucamonga, CA
Bid Date: Dec 11 2025
Rancho Cucamonga, CA
Bid Date: Mar 17 2021
Rancho Cucamonga, CA
Bid Date: Jan 07 2026
Rancho Cucamonga, CA
Bid Date: Nov 26 2025
Rancho Cucamonga, CA
Bid Date: Oct 30 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
