BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2026 at 7:00 PM

Updated January 8, 2026

Site work and addition to a playground / park / athletic field in Rancho Cucamonga, California. Completed plans call for the addition of a one-story above grade playground / park / athletic field.

Contractor shall furnish all supervision, labor, materials, tools, equipment, and incidentals required to perform the complete work for the North Etiwanda Preserve Bathroom Addition Project in accordance with the approved plans and specifications. The work includes but is not limited to: site clearing and grading; installation of a prefabricated restroom structure; construction of concrete foundations, pads, and walkways; installation of underground utilities and sewage holding tank; connection to existing water, electrical, and sewer systems; implementation of erosion and sediment control measures; and restoration of all disturbed areas to pre-construction conditions. All work shall conform to the requirements of the San Bernardino County Department of Public Works - Special Districts, applicable building codes, and regulatory agency standards. Bids can be submitted through the County Electronic Procurement Network (ePro) or in person at the Department. All bidders must register with the ePro system prior to the date and time to receive sealed bids or they will be disqualified. Late or incomplete bids will be considered nonresponsive. A "complete" bid is defined as a bidder's submittal that includes all bid documents (the bid/proposal, bidder's security in a separately sealed envelope, and any other bid documents required for the project). All bidders and subcontractors must be registered with the Department of Industrial Relations (with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)); and the County's ePro system prior to the date and time to receive sealed proposals or they will be disqualified. The lowest responsive and responsible bidder and its subcontractors must also be registered with the Department of Industrial Relations at the time of award of the contract and must remain registered throughout the term of the contract pursuant to Labor Code section 1771.1. 2.1.1 Contractor will furnish all materials, labor, tools, equipment, apparatus, facilities, transportation, construction, landscaping, clean-up, and all other construction services of any type necessary to complete all Work in strict conformity with the Contract Documents. Except with regard to any material to be provided and/or installed by District, Contractor shall fully commission and turn over a complete operational and fully functional Project to District. Without limiting the generality of this Section, Contractor shall provide the following Work and services: a. Contractor shall provide, install and complete as specified and pay for all labor, materials and equipment, tools, supplies, construction equipment and machinery, construction, start-up and testing, utilities, transportation, and other facilities and services (including any temporary materials, equipment, supplies and facilities) necessary for the proper execution and completion of the complete, operational, and fully functional Project, including the permanent interconnection for electricity, natural gas, water supply, and any other utilities and demonstration of fully satisfactory operation of all systems and equipment. The District will pay connection fees directly to the utilities for all permanent water and electrical connections. b. Contractor shall supervise and direct the Work, and shall furnish the services of all supervisors, forepersons, skilled and unskilled labor, and all other personnel necessary to construct the complete, operational, and fully functional Project. Contractor shall provide, manage and organize such personnel as necessary to complete the Work in accordance with all requirements of the Contract Documents. c. Contractor shall obtain, at Contractor's expense, all governmental and private approvals, permits and licenses, required to complete the Work; provided, however, District will be responsible for paying the cost of all County imposed fees necessary for the Project. Contractor shall construct a complete, operational, and fully functional Project in full compliance with all Applicable Laws, codes and standards (both public and private), including but not limited to, the standards included and warranties expressed in the Contract Documents and manufacturer's recommendations pertaining to individual items of equipment or systems. 6.1.1 Contractor shall provide all materials, labor, equipment, and undertake all efforts necessary or appropriate to construct the Project in accordance with the requirements of the Contract Documents, all governmental approvals, all Applicable Law, and all other applicable safety, environmental and other requirements taking into account the constraints affecting the Project Site. Except as otherwise specifically provided in this Contract, all materials, services and efforts necessary to achieve Final Completion of the Project and elements thereof on or before the deadlines provided in the Contract Documents shall be Contractor's sole responsibility. The costs of all such materials, services and efforts are included in the Contract Sum. 6.1.2 The Contractor and all Subcontractors shall obtain any required licenses from the local jurisdiction where the Project is located (i.e. local City or County), prior to commencement of Work.

Post-Bid

Playgrounds / Parks / Athletic Fields

$500,000.00

Public - County

Addition, Site Work

11

16

7

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2026

February 6, 2026

Project location map

4890 Etiwanda Ave, Rancho Cucamonga, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.