BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2026 at 7:00 PM

Updated February 5, 2026

Site work and paving for a mixed-use development in Huntington Beach, California. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Work of this contract will generally consist of: abatement of lead and asbestos containing materials by a qualified abatement contractor; removal and replacement of concrete barriers, tubular hand railing, and bridge deck; removal and replacement of girders and diaphragms; removal and replacement of concrete pedestals and bearing assemblies; removal and replacement of water line and appurtenances; removal and replacement of concrete sidewalks, curb & gutter, wingwall, and approach slab; removal and replacement of unsound concrete; removal and reconstruction of roadway structural section; fill concrete cracks with epoxy; utility relocation; traffic control; signing and striping work; and appurtenance work as required. Question Deadline 01/08/2026 at 9:00 AM PT Online Q&A Yes This is a federally funded project. Response Types Line Items Type of Award Lump Sum License Requirements State Contractor's License Class A Bid Valid 60 days after bid opening Liquidated Damages $5,200 per calendar day. Project Duration 200 working days

Bid Results

Bridges / Tunnels

$3,801,237.00

Public - City

Paving, Site Work

54

8

3

5

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
25
Bidding Soon
2,577
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2026

March 23, 2026

Project location map

Humboldt Dr, Huntington Beach, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.