Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 29, 2026 at 7:00 PM
Updated January 30, 2026
Renovation of a laboratory facility in Louisville, Kentucky. Completed plans call for the renovation of a laboratory facility.
A. The Contractor shall provide all materials, equipment, labor, supervision, incidentals, and all other items necessary to complete the project in accordance with the requirements of the Contract Documents. B. The Work of this Project is defined by the Contract Documents and includes, but is not limited to, the following: Selective Demolition: o Remove existing rooftop HVAC units, interior AHU components, supply/return duct- work, piping, controls, and associated electrical feeders. o Remove portions of acoustic ceilings, soffits, roof curbs, pads, and exterior metal panels as needed for new work. Mechanical: o Furnish and install new packaged rooftop equipment, ductwork, hydronic and condensate piping, insulation, dampers, fire-stopping at penetrations, vibration/seismic supports, equipment pads, and automatic DDC controls. o Provide testing, adjusting, and balancing (TAB) of new and existing systems. Existing HVAC System Cleaning: o Clean, disinfect, and verify existing supply/return ductwork and plenums scheduled to remain. Coatings and Protection: o Apply factory/field anticorrosion coatings to new coils, circuitry, and exposed HVAC metals as specified. Electrical: o Provide new feeders, branch circuits, disconnects, VFDs, panel modifications, grounding, and lighting revisions required for HVAC equipment and ceiling work. Architectural: o Patch and trim new duct penetrations through the exterior soffit; install new exterior lou- ver/trim assemblies. o Remove and reinstall acoustical panel ceilings disturbed by mechanical/electrical work; replace damaged components. Commissioning and Closeout: o Start-up, testing, and TAB of all new HVAC systems. o Provide demonstration and training for Owner staff. o Deliver O&M manuals and record documents. All work shall be done in accordance to MSD's Standard Specifications. The Engineer's Construction Cost Estimate for this project is between $ 600,000 and $ 1,000,000 . *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. If selected as applicable below, the Contractor must subcontract at least 18.0% of the total amount of the Contract Bid price to Question Deadline 02/05/2026 at 10:00 AM ET certified African American minority-owned businesses, at least 2.0% of the total amount of the Contract Bid price to certified Asian-Indian American minority-owned businesses, and at least 15.0% total amount of the Contract Bid price to certified Caucasian Female businesses D26156 FAC. NO. MSD0278
Sub-Bidding
Laboratories
$1,000,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 10, 2026
April 9, 2026
4522 Algonquin Pkwy, Louisville, KY
Related To This Project
Louisville, KY
Bid Date: Jan 08 2026
Louisville, KY
Bid Date: Jan 16 2026
Louisville, KY
Bid Date: Feb 03 2026
Louisville, KY
Bid Date: Jan 16 2026
Louisville, KY
Bid Date: Jan 16 2026
Louisville, KY
Bid Date: Jan 07 2026
Louisville, KY
--
Louisville, KY
Bid Date: Dec 31 2025
Louisville, KY
--
Louisville, KY
--
Louisville, KY
Bid Date: Jan 20 2026
Louisville, KY
--
Louisville, KY
--
Louisville, KY
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
