Site work and paving for a mixed-use development in Lawrenceville, Georgia. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
E22037 The project is located along West Pike Street in Lawrenceville, Georgia between Hurricane Shoals Road and just past Honeysuckle Avenue. Work will include but is not limited to demolition and replacement of existing curb and gutter along West Pike Street, construction of new pedestrian sidewalks, site grading, erosion control including landscaping/sodding of all areas disturbed by construction activities, striping and pavement markings, relocation/adjustments of existing utilities, signage, and structures, and construction of retaining walls where required Questions regarding bids should be directed in writing to Chris Duncan, CPPB, Buyer at chris.duncan@lawrencevillega.org no later than 3:00 P.M. on January 13, 2026. The work to be performed by the Contractor consists of but is not limited to the following: The project is located along West Pike Street in Lawrenceville, Georgia between Hurricane Shoals Road and just past Honeysuckle Avenue. Work will include but is not limited to demolition and replacement of existing curb and gutter along West Pike Street, construction of new pedestrian sidewalks, site grading, erosion control including landscaping/sodding of all areas disturbed by construction activities, striping and pavement markings, relocation/adjustments of existing utilities, signage, and structures, and construction of retaining walls where required. All construction operations must be conducted from 9 PM to 5 AM on weekdays. Contractor to follow the GDOT & MUTCD Traffic Control standards and allow moving traffic in the intersections at all times. Pedestrian traffic must be rerouted with appropriate MUTCD signage. Contractor must have retaining wall construction experience
Post-Bid
Sidewalks / Parking Lot
$800,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 27, 2026
February 26, 2026
615 W Pike St, Lawrenceville, GA
Related To This Project
Lawrenceville, GA
Bid Date: Jan 28 2026
Lawrenceville, GA
Bid Date: Feb 03 2026
Lawrenceville, GA
Bid Date: Feb 03 2026
Lawrenceville, GA
Bid Date: Jan 27 2026
Lawrenceville, GA
Bid Date: Feb 13 2026
Lawrenceville, GA
Bid Date: Feb 13 2026
Lawrenceville, GA
Bid Date: Feb 13 2026
Lawrenceville, GA
Bid Date: Feb 10 2026
Lawrenceville, GA
Bid Date: Apr 01 2025
Lawrenceville, GA
Bid Date: Jan 16 2026
Lawrenceville, GA
--
Lawrenceville, GA
Bid Date: Jan 20 2026
Lawrenceville, GA
Bid Date: Jan 06 2026
Lawrenceville, GA
Bid Date: Jan 14 2026
Lawrenceville, GA
Bid Date: Jan 14 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.