BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 16, 2026 at 7:00 PM

Updated January 17, 2026

Site work and new construction of a transportation facility in San Rafael, California. Conceptual plans call for the construction of a transportation facility.

https://www.sacbee.com/news/article314135343.html Responding to an environmental study that supports the plan, San Rafael officials sent letters to Marin Transit in December renewing their position that a bus yard does not conform with the property's designation for commercial use. The 3.5-acre project site is at 1075 Francisco Blvd. East in the Canal neighborhood. ______________ Marin County Transit District is requesting a statement of qualifications from experienced and qualified consulting firms or teams to develop designs, engineering, and complete the Plans, Specifications, and Estimates for the construction of a consolidated and centralized fixed route Zero Emissions Bus Operations & Maintenance Facility at 1075 Francisco Boulevard East, San Rafael, CA 94901. The selection will follow a two-phase procurement process: Phase I: Firms submit their statement of qualifications. The highest-ranked firms based on the evaluation criteria will be invited to interview and present to the Evaluation Committee. No fewer than three firms are anticipated to be shortlisted. The committee will establish the final ranking after interviews and presentations. Phase II: Marin Transit will negotiate the scope, project plan, and fee with the highest-ranked firm. This includes an opportunity for the firm to discuss these items with Marin Transit. The highest-ranked firm must submit a final project scope, plan, and fee. If negotiations are unsuccessful, Marin Transit will proceed to the next highest-ranked firm, continuing until agreement is reached or it is determined that no agreement can be made with any of the shortlisted firms. Questions Due Date: Jan 20th 2026, 5:00 PM PST *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.Updated construction costs are estimated between $20.7 million and $30 million

Conceptual

Transportation Terminals

$30,000,000.00

Public - County

New Construction, Site Work

18

16

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
492
Active Projects
233
Bidding Soon
2,870
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2026

Project location map

1075 Francisco Boulevard East, San Rafael, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.