BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 6, 2026 at 7:00 PM

Updated January 7, 2026

Renovation of a municipal facility in Tiffin, Ohio. Completed plans call for the renovation of a 13,333-square-foot municipal facility.

Tiffin Renovation Submit all questions regarding this RFQ in writing to Amber Haskins at amber.m.haskins2.nfg@army.mil with the project number included in the subject line (no phone calls please). The 13,333 SF Ohio Army National Guard Readiness Center sits on 2.639 acres just outside of downtown Tiffin, OH. It is flanked by a housing development on the south, Kernan Park and a ball field on the North and East sides with the Sandusky River on the west side. The 1954 facility will be the workplace of the148th infantry division with 3 full time staff M-F and up to 200 weekend warriors. This project will improve overall functionality and life span of the facility, lending to the success of soldier readiness. AE project scope includes: 1. Thorough investigation and testing including but not limited to structural and foundation assessment, utility investigations and testing, scoping, jetting, etc. (using allowance fees) 2. Design services for the following areas: (based on investigative findings) a. Hazardous material abatement b. structural repairs c. all necessary utility upgrades and replacements (electric, gas, water, sanitary, storm) d. MEP repairs and replacements as needed (local controls only); Fire alarms; IT; and electronic security systems (ESS) (The owner will hire a 3rd party commissioning agent for MEP reviews and commissioning) e. Interior and exterior Lighting f. Roof, windows, and doors g. Expand and update male and female latrines h. Re-design office and meeting space layout i. Interior and exterior architectural finishes and designs. j. Parking lot expansion, re-paving, drainage and lighting k. Landscaping, sidewalks, and grading l. Fencing and perimeter security 3. Bid and Construction and close out administration Anticipated Schedule Professional Services Start: 03 / 26 Construction Notice to Proceed: 02 / 27 Substantial Completion of all Work: 12 / 27 Professional Services Completed: 01 / 28 EDGE Participation Goal Percent of initial Total A/E Fee: 5.0%

Post-Bid

Municipal

$6,300,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
145
Bidding Soon
1,736
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2026

February 1, 2027

Project location map

To Be Determined, Tiffin, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.