BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 9, 2025 at 8:00 PM

Updated July 10, 2025

Site work for a water / sewer project in Tiffin, Ohio. Completed plans call for site work for a water / sewer project.

A DBE goal of 5.4% has been assigned to this project. The scope of work consists of sanitary sewer repair and associated restoration within Combined Sewer Overflow Basins 9-13 & 15. Question Deadline 06/19/2025 at 3:00 PM ET All Pre-Bid questions are required to be submitted to the City Engineer . The contract is required to be completed no later than May 29, 2026. Each bidder is required to furnish with it s a proposal, a Bid Guaranty and Contract Bond in accordance with Section 153.54 of the Ohio Revised Code. Bid security furnished in Bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety. Each proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. All contractors and subcontractors involved with the project will to the extent practicable use Ohio products, materials, services, and labor in the implementation of their project. The project is being constructed with funds from the Ohio Environmental Protection Agency, Division of Environmental and Financial Assistance and funds from the Ohio Public Works Commission (OPWC). This project will be subject to Federal Prevailing Wage Rates (Davis-Bacon Act). It will also be subject to all applicable Federal Equal Opportunity Laws, and related regulations as well as the equal employment opportunity requirements of Ohio Administrative Code Chapter 123. No bidder shall be permitted to withdraw their bid for a period of 90 days after the time of opening bids. The procurement is subject to the EPA policy of encouraging the participation of small business in rural areas (SBRAs). A DBE goal of 5.4% has been assigned to this project. Should any bid be rejected, the accompanying bid bond, or check, will be returned to the bidder forthwith and should any bid be accepted, the check, or bid bond will be returned upon the proper execution and securing of the contract.

Award

Water / Sewer

$3,173,865.00

Public - City

Site Work

49

19

56

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
144
Bidding Soon
1,794
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2025

August 25, 2025

Project location map

Multiple Locations, Tiffin, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.