Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 11, 2025 at 7:00 PM
Updated December 12, 2025
Renovation of a mixed-use development in Tiffin, Ohio. Completed plans call for the renovation of a 6,000-square-foot educational facility.
As of August 27, 2025, construction documents are complete. This project will bid in winter 2026 with construction commencing in May 2026. Tiffin City Schools Middle School Student Dining Renovations ; Location- 103 Shepherd Drive Tiffin, Ohio 44883; Replace existing metal-clad wood windows and doors in the student dining room with aluminum storefront windows and doors and new masonry knee wall. Provide new wall and door to existing Table Storage Room. Repair damaged gypsum wallboard bulkheads near the window wall. New flooring, wall base, paint, window coverings, and proscenium finishes throughout the space. HVAC Work: Select removal, storage and reinstallation of existing HVAC diffuser/grilles as required for general construction. Diffusers shall be painted by Generial Contractor prior to resinstallation by HVAC con Electrical Work: Replace/retrofit existing lighting where indicated. Provide new lighting and connect to existing lighting circuit. Existing storefront fire alarm pull stations shall be removed and reinstalled on new storefront. Rough-ins will be provided for motorized shades. The Project consists of the construction of +Replace the existing metal clad wood windows and doors in the student dining room with aluminum storefront windows and doors and new masonry knee wall. Provide new wall and door to existing Table Storage Room. Repair damaged gypsum wallboard bulkheads near window wall. New flooring, wall base, paint, window coverings and proscenium finishes throughout space. Replace/retrofit existing lighting where indicated. Provide new lighting and connect to existing lighting circuit. Existing storefront fire alarm pull stations shall ne removed and reinstalled on new storefront. Rough-ins will be provided for motorized shades.. Estimate of Construction Cost: $430,000 Owners desired start date: May 26, 2026 Owners desired completion date: August 14, 2026
Bid Results
Educational
$379,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 4, 2025
May 26, 2026
103 Shepherd Dr, Tiffin, OH
Related To This Project
Tiffin, OH
Bid Date: Jun 02 2025
Tiffin, OH
Bid Date: May 19 2025
Tiffin, OH
Bid Date: May 29 2025
Tiffin, OH
Bid Date: Jun 26 2025
Tiffin, OH
Bid Date: Jul 28 2025
Tiffin, OH
Bid Date: Jul 23 2025
Tiffin, OH
Bid Date: Oct 01 2025
Tiffin, OH
Bid Date: Apr 17 2025
Tiffin, OH
Bid Date: Apr 03 2025
Tiffin, OH
--
Tiffin, OH
Bid Date: Feb 20 2025
Tiffin, OH
Bid Date: Feb 20 2025
Tiffin, OH
Bid Date: Jan 16 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
