BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 11, 2025 at 7:00 PM

Updated December 12, 2025

Renovation of a mixed-use development in Tiffin, Ohio. Completed plans call for the renovation of a 6,000-square-foot educational facility.

As of August 27, 2025, construction documents are complete. This project will bid in winter 2026 with construction commencing in May 2026. Tiffin City Schools Middle School Student Dining Renovations ; Location- 103 Shepherd Drive Tiffin, Ohio 44883; Replace existing metal-clad wood windows and doors in the student dining room with aluminum storefront windows and doors and new masonry knee wall. Provide new wall and door to existing Table Storage Room. Repair damaged gypsum wallboard bulkheads near the window wall. New flooring, wall base, paint, window coverings, and proscenium finishes throughout the space. HVAC Work: Select removal, storage and reinstallation of existing HVAC diffuser/grilles as required for general construction. Diffusers shall be painted by Generial Contractor prior to resinstallation by HVAC con Electrical Work: Replace/retrofit existing lighting where indicated. Provide new lighting and connect to existing lighting circuit. Existing storefront fire alarm pull stations shall be removed and reinstalled on new storefront. Rough-ins will be provided for motorized shades. The Project consists of the construction of +Replace the existing metal clad wood windows and doors in the student dining room with aluminum storefront windows and doors and new masonry knee wall. Provide new wall and door to existing Table Storage Room. Repair damaged gypsum wallboard bulkheads near window wall. New flooring, wall base, paint, window coverings and proscenium finishes throughout space. Replace/retrofit existing lighting where indicated. Provide new lighting and connect to existing lighting circuit. Existing storefront fire alarm pull stations shall ne removed and reinstalled on new storefront. Rough-ins will be provided for motorized shades.. Estimate of Construction Cost: $430,000 Owners desired start date: May 26, 2026 Owners desired completion date: August 14, 2026

Bid Results

Educational

$379,000.00

Public - City

Renovation

20

21

11

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
150
Bidding Soon
1,782
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2025

May 26, 2026

Project location map

103 Shepherd Dr, Tiffin, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.