Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 26, 2026 at 7:00 PM
Updated February 27, 2026
Site work and new construction of a mixed-use development in Winnipeg, Manitoba. Completed plans call for the construction of a 5,500-square-foot, 0-story below grade fitness / recreation center; and 1,850-square-foot, 0-story below grade day care center.
The work consists of constructing a new 5,500m2 Recreation Centre and a 1,850m2 Child Care Centre designed to be energy efficient and net-zero carbon ready. The Recreation Centre will be a steel-framed structure, including three gymnasiums with mezzanine, a walking/running track and fitness areas, multiple multi-purpose spaces, change rooms, washrooms, lobby/common space, tenant lease space, parking, and related site development. The Child Care Centre will be a wood-framed structure, including infant and preschool play rooms, administrative offices, kitchen, staff room, and operational/maintenance support spaces. Major components include foundation and crawlspace, superstructure (steel framing for the Rec Centre and wood framing for the Child Care Centre), building envelope, interior partitions and finishes, mechanical systems, electrical systems, and site works including grading, drainage, utilities, services, and hard and soft landscaping. The contractor must comply with the City of Winnipeg Green Building Policy and Universal Design Policy. The contract is divided into three main construction components for cost accountancy: Part A - Recreation Centre, Part B - Child Care Centre, and Part C - Site Development, which includes all subsurface infrastructure. The contractor is required to submit a proper invoice with a comprehensive cost breakdown for each part monthly. Buyer Requires E-Bonding - Bid Bond 10 % - Performance Bond 50 % - Labor and Materials Bond 50 % Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Deadline 01/15/2026 Any enquiries concerning submitting through MERX should be addressed to: MERX Customer Support Phone: 1-800-964-6379 Email: merx@merx.com
Bid Results
Fitness / Rec Centers
$71,222,464.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 19, 2026
April 3, 2026
Multiple Locations, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Jan 20 2026
Winnipeg, MB
Bid Date: Jan 27 2026
Winnipeg, MB
Bid Date: Feb 06 2026
Winnipeg, MB
Bid Date: Mar 01 2021
Winnipeg, MB
Bid Date: May 22 2020
Winnipeg, MB
Bid Date: Mar 10 2021
Winnipeg, MB
Bid Date: May 13 2021
Winnipeg, MB
Bid Date: Apr 21 2021
Winnipeg, MB
Bid Date: Jan 28 2026
Winnipeg, MB
Bid Date: Jan 09 2026
Winnipeg, MB
Bid Date: Jan 19 2026
Winnipeg, MB
Bid Date: Jan 21 2026
Winnipeg, MB
Bid Date: Jan 21 2026
Winnipeg, MB
Bid Date: Feb 20 2026
Winnipeg, MB
Bid Date: Dec 19 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
