BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 27, 2026 at 7:00 PM

Updated January 28, 2026

Site work for a sidewalk / parking lot in West Peoria, Illinois. Completed plans call for site work for a sidewalk / parking lot.

Heading & Cortland Ave: $142,000.00 Manor Parkway: $200,000.00 Proposals are requested for the Heading Ave and Cortland Ave Sidewalk Project and Manor Parkway Sidewalk Project (TIF project). Bid documents can be examined and obtained at the Office of the City Clerk or by email request, specifying the project name, company name, email address, and phone number. No documents will be sent by mail or facsimile. Sealed bids must be submitted to the specified address during normal business hours. Each bid must include a Bid Security in the form of a bid bond, cashier's or certified check, or a money order payable to the City of West Peoria, guaranteeing that, if the bid is accepted, the bidder will provide the appropriate Certificate(s) of Insurance, required Performance Security, and execute the Agreement within the specified periods. The City reserves the right to reject any or all bids and to waive any formality, irregularity, or technicality if deemed in the best interest of the City. The proposed work, officially known as the SSA 2026-01, Heading and Cortland Ave. Sidewalk Project, is for the replacement of the sidewalks on the south side of the street between Ashland Avenue and Cortland Avenue. The project will start at the southwest corner of 2726 W. Heading Ave. on Ashland Ave., wrapping around Heading Ave., traveling east on the south side of the street until Cortland Ave., approximately 355 feet, turning onto Cortland Ave. On Cortland Ave, the sidewalks will be replaced on the west side of the street from Heading Ave. to the south corner of the property located at 905 N. Cortland Ave., and tying into the existing sidewalks from Laura Ave. The project includes 2 ADA ramps: the corner of Heading Ave. and Ashland Ave., and at Heading Ave. and Cortland Ave. The contractor must also include a five-foot (5) adjustment for the drive approaches at the current width per drive and walk. All questions should be directed to the Street Department Manager, City Garage, 1322 North Hillside Avenue, West Peoria, Illinois 61604 or by phone at (309) 674-1994. Bidders requiring clarification or interpretation of the Bidding Documents shall make a written request to the City. All questions should be directed to the Street Department Manager, City Garage, 1322 North Hillside Avenue, West Peoria, Illinois 61604 or by phone at (309) 674-1994.

Award

Sidewalks / Parking Lot

$114,500.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
0
Bidding Soon
779
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2026

February 18, 2026

Project location map

Multiple Locations, West Peoria, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.