Published April 3, 2026 at 8:00 PM

Updated April 4, 2026

Site work for a water / sewer project in North Freedom, Wisconsin. Completed plans call for site work for a water / sewer project.

Installation of wastewater siphon (depressed sewer) under the Baraboo River, including approximately 330 feet of twin 6-inch high density polyethylene (HDPE) pipe (660 linear feet total) installed by horizontal directional drilling (HDD) within a private easement. Installation of 110 feet of 8-inch PVC sanitary sewer and associated siphon inlet and outlet manholes. Construction of a gravel access drive within an existing sewer easement north of the bridge for access to the proposed siphon outlet manhole. Connection of new sanitary sewer to existing manholes. Installation of a flushing hydrant on the west side of the bridge near the siphon inlet manhole for convenient flushing and maintenance. Installation of a 4-inch sanitary lateral to service a future homeowner's development, as well as sewer abandonment and minor electrical demolition work. Bidders must submit a certified check or bid bond equal to at least 5% of the bid amount as a guarantee, to be forfeited if contract and bond are not executed within 15 days of award. No bid may be withdrawn within 60 days of opening. Minimum wages to be paid in accordance with Federal Davis Bacon Wage Rates, with the latest federal wage rate to be used at the time of bid opening. Participation by Disadvantaged Business Enterprises (DBEs), including Minority-owned Business Enterprises (MBEs), Women's Business Enterprises (WBEs), and Small Businesses in Rural Areas (SBRAs), is encouraged, with a combined minimum goal of 15% participation for MBE/WBE utilization. Contractors must conform to the "Use of American Iron and Steel" provision of H.R. 3547 Consolidated Appropriations Act, 2014, section 436. Question Deadline 01/27/2026: Contact information and submittal procedures for questions are as follows: Christian Moring, PE, (224) 587-7706 | cmoring@msa-ps.com. Questions received less than seven days prior to the date for opening of Bids may not be answered. A municipality, in awarding prime contracts, and primary contractor, in awarding subcontracts, are required to make a good faith effort to achieve a combined minimum goal of 15% participation for MBE/WBE utilization in accordance with s.NR 162.09(3), s.NR 166.12(4), and s.NR 167.18(4) Wis. Admin. Code

Award

Water / Sewer

$274,112.00

Public - City

Site Work

23

22

13

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
4
Bidding Soon
794
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2026

March 5, 2026

Project location map

South Maple Street, North Freedom, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.