Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 10, 2026 at 7:00 PM
Updated February 12, 2026
Site work and new construction of a municipal facility in Harper, Kansas. Completed plans call for the construction of a 6,900-square-foot, one-story above grade municipal facility.
The work consists of the design and construction of a pre-engineered metal building to serve as a municipal Public Works Shop. The building shall be 115 feet long by 60 feet wide, and include three vehicle bays, a breakroom, and a bathroom, meeting all applicable building and safety standards. The facility should aim for the highest level of energy efficiency reasonably possible within the scope and purpose of the project. The Contractor will provide a complete, functional facility including all design, engineering, construction, and site work. The scope includes, but is not limited to: a pre-engineered metal building (with possible alternative dimensions if cost savings and functional requirements are justified), an engineered concrete slab to support equipment up to 45,000 lbs, and fully constructed and finished interior breakroom and bathroom. The breakroom must accommodate 7-10 occupants and include features such as durable flooring, cabinetry, counter space, appliances, HVAC, lighting, insulation, and soundproofing. The bathroom must have commercial fixtures, finishes, proper water and ventilation, lighting, electrical outlets, and climate control. The shop area must support routine and advanced mechanical work with three vehicle bays (specified door sizes), heating, trench drain, and provision for a vehicle lift. The exterior includes a 5' wide concrete sidewalk surrounding the building and exterior lighting at all access points, designed for safety, security, and code compliance. Any proposed changes to dimensions must be justified within the proposal, detailing functional, operational, safety needs, cost savings, and future impacts. The Contractor must deliver all elements as outlined, ensuring full operational readiness for Public Works use. Questions regarding this RFQ/RFP may be directed to: Tiffany Cooperrider, City Administrator Phone: (620) 896-2511 Email: tcooperrider@cityofharper.com
Post-Bid
Municipal
$600,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 12, 2026
February 11, 2026
NW corner of Main Street and Boone Street, Harper, KS
Related To This Project
Harper, KS
Bid Date: Feb 17 2026
Harper, KS
Bid Date: Mar 23 2026
Harper, KS
Bid Date: Sep 24 2025
Harper, KS
Bid Date: Sep 17 2025
Harper, KS
Bid Date: Oct 22 2025
Harper, KS
Bid Date: Apr 10 2025
Harper, KS
Bid Date: Jan 06 2025
Harper, KS
Bid Date: Dec 03 2024
Harper, KS
Bid Date: Dec 03 2024
Harper, KS
Bid Date: Oct 16 2024
Harper, KS
Bid Date: Sep 16 2024
Harper, KS
--
Harper, KS
Bid Date: Jul 17 2024
Harper, KS
Bid Date: Jul 17 2024
Harper, KS
Bid Date: May 07 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
