Published February 2, 2026 at 7:00 PM

Updated February 3, 2026

Site work and renovation of a transportation facility in Pellston, Michigan. Completed plans call for the renovation of a transportation facility; and for site work for a transportation facility.

Question Deadline 01/19/2026 at 3:00 PM ET Questions shall be submitted in writing to David R. Anolick, Project Manager at danolick@emmetcounty.org The purpose of this request is to invite prospective vendors to submit a proposal to supply Emmet County with wallpaper removal and painting services as described below and in the attached documents. The Vendor shall provide the following related to this particular RFP A. The contractor is responsible for removing all existing vinyl wall coverings (i.e. wallpaper) within the designated work area, including properly disposal off-site. The contractor must patch and repair all wall surfaces as required to ensure they are suitable to receive new painted finishes in accordance with the specifications. B. Refer to Exhibit A for detailed painting specifications. All finish colors must match existing colors. Samples of all paint finishes and colors shall be submitted to the County for approval. C. Refer to Exhibit B for the main terminal plan, which highlights in orange the walls, ceilings, and soffit areas to be painted on both floors. Note There is no floor plan for the General Aviation (GA) facility. The entire one-level GA building interior shall be painted. This scope will be reviewed during the mandatory walk-through on January 16. D. A detailed proposal must be submitted with pricing itemized separately for: o Main terminal - Ground Floor o Main terminal - Second Floor o GA (General Aviation) Building - Complete Interior E. Alternate: The GA building airfield-side vestibule wall and ceiling repairs and painting must be priced as a separate line item. This scope will also be covered during the walk-through. F. Refer to Exhibit C for reference photos of the GA (General Aviation) Building. G. Refer to Exhibit D for reference photos of the Main Terminal Building. H. Pricing shall include all labor required to move furniture in occupied areas to access walls. I. The contractor must provide one gallon of each paint color for touch-up attic stock. Emmet County is soliciting proposals from prospective vendors to provide the County with interior painting services at the Pellston Airport main terminal and general aviation buildings located at 1395 North US 31, Pellston, MI 49769.

Award

Transportation Terminals

$46,207.00

Public - County

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
24
Bidding Soon
248
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2026

March 2, 2026

Project location map

1395 US-31, Pellston, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.