BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 2, 2026 at 8:00 PM

Updated April 3, 2026

Site work and new construction of a municipal facility in Woodbine, Georgia. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

Questions regarding this construction project may be directed in writing to the Purchasing Officer, Kelsey Kelley at bids@camdencountyga.gov. The county reserves the right to reject all proposals that are non-responsive or not responsible. Questions regarding this project may be directed in writing to the Purchasing Officer, Kelsey Kelley, at bids@camdencounty.ga.gov. All questions shall be received by February 18, 2026 and answered by February 23, 2026. Answers to questions 1/30/2026 5PM EST Provide all work and labor for new construction of the Public Works and Fleet Facility which includes: SITE: 13142 GA Hwy 110, Woodbine, GA 31569 Disturbance of 11.2 Acres of 22 Acre site. New entry drive from Georgia Highway 110, paved parking areas, underground water and sewer services, site lighting system; installation of new paved and unpaved parking areas, new irrigation system, new fuel island, chain link fencing, automatic gate system, flag pole, new site sidewalks, site and field grading, detention pond and swales, landscaping; lighting poles, fixtures, circuits, and controls for the new parking lot lighting systems, and all panels and feeders shown on the electrical drawings. BUILDING: 14,000GSF Pre-Engineered Metal Building systems (PEMB) over 4" and 6" reinforced concrete slab, 5 ton bridge carne, storage mezzanine, 2 hour rated steel stud wall between Office areas (5,011GSF) and Shop Areas (9,069GSF), electrical/manual overhead doors, acoustical tile ceilings, gypsum board ceilings, Cabinetry with solid surface and laminated countertops, toilet fixtures, toilet partitions, toilet accessories, exterior storefront systems, ceramic tiling, pipe bollards, carpet tile, Luxury Vinyl Plank (LVT) flooring, painted concrete, rubber floor base, wood and metal doors, hollow metal frames, domestic cold and hot water systems with tank and tankless water heaters, ventilated and heated shop areas with fume extractor(s), exhaust fans, HVAC VRF systems, HVAC Split Systems, HVAC System controller, LED lighting, Low voltage systems, ERRC System, CCTV and DATA, Diesel Fuel Generator, 2 single phase pad mounted transformers connected in high-leg configuration to provide 240V, 3 -phase (high leg) System. Additive Alternates for Additional Garage Storage, Covered Equipment Storage Canopy, Large Equipment Storage Canopy and Covered Repair vehicle Parking. The Work shall also include all cleaning associated with the construction of the project. The Contractor shall provide the necessary labor, construction equipment, fuel, and materials required for the successful completion of the project. All Work shall conform to the Plans. Fully complete the Work within 360 calendar days. Project No- 23044, 10.2403

Post-Bid

Municipal

$3,000,000.00

Public - County

New Construction, Site Work

80

28

31

2

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
4
Bidding Soon
551
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2026

May 11, 2026

Project location map

13142 GA-110, Woodbine, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.