BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 2, 2026 at 7:00 PM

Updated February 5, 2026

Site work for a water / sewer project in Wickliffe, Ohio. Completed plans call for site work for a water / sewer project.

The work includes the installation of 3,597 feet of new 8" PVCO Water Main, AWWA C909, PC 235 PSI with AWWA Class 53 Ductile Iron Fittings along Regent Road in the City of Wickliffe. The new watermain starts at the intersection with Worden Road and heads east to connect with an existing 8" water main along Truman Avenue. The new watermain will include 6" to 8" side road water connections. The project will also include installation of 9 new hydrants, 76 long side water service connections, and 15 short side water service connections and meter vaults. The existing 8" waterline, hydrant branches, and gate valves are to be abandoned. Sidewalk replacement and pavement restoration above the watermain, hydrant, and open cut service connections shall consist of either 1-1/2" of ODOT Item 441, Surface Course over 7-1/2" of ODOT 305 Concrete Base and minimum 6" of ODOT 304 Aggregate Base or 9" of Non-Reinforced Concrete Pavement of ODOT 451 and minimum 6" of ODOT 304. Concrete drive/apron work will be required as needed to install proposed water service connections and meter vaults. This work consists of locating, furnishing, installing, and maintaining temporary sediment and erosion control Best Management Practices (BMP) for earth disturbing activity areas, developing a Storm Water Pollution Prevention Plan (SWPPP), performing Storm Water Pollution Prevention Inspections, filing a Co-Permittee form as required. Furnish a SWPPP if required prior to any earth disturbing activity. Furnish and install temporary sediment and erosion control BMPs in compliance with all National Pollutant Discharge Elimination System (NPDES) and surface water permits. Amend the SWPPP in accordance with the Ohio Environmental Protection Agency (Ohio EPA) General Construction Stormwater NPDES Permit. In the event of conflict between these requirements and pollution control laws, rules, or regulations of other Federal, State, or local agencies, adhere to the more restrictive laws, rules, or regulations. Ground photography shall consist of color video taping of surface features taken along the entire length of the project and including all work and storage areas and all intersecting roadways. Prior to audio-video taping of the project, all areas to be inventoried shall be investigated visually with notations made of items not readily visible by taping methods. Audio-video tape shall be DVD format, as approved by the Owner. Inquiries must be submitted in writing to Consulting Engineer, Dan Bender at Euthenics, Inc., dtbender@euthenics-inc.com, 440-260-1555 prior to end of business on Wednesday, January 28, 2025. All work under this contract shall be completed within 150 days of Notice to Proceed

Post-Bid

Water / Sewer

$1,830,861.00

Public - City

Site Work

21

12

6

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
320
Active Projects
178
Bidding Soon
1,773
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2026

April 6, 2026

Project location map

Regent Road from Worden Road to Truman Avenue, Wickliffe, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.