BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 16, 2026 at 7:00 PM

Updated March 7, 2026

This is a service / maintenance or supply contract in Ayer, Massachusetts. Contact the soliciting agency for additional information.

The work consists of removal and replacement of AIX (Anion Exchange Resin) media of one existing AIX vessel at the Grove Pond Water Treatment Plant. All work must be substantially complete within 90 consecutive calendar days from the date fixed in the Notice to Proceed and fully completed within 120 consecutive calendar days from the date fixed in the Notice to Proceed. Sealed bids must be accompanied by a bid security in the amount of five percent of the Bid Total for Year 1, 2026. The successful bidder must furnish a fifty percent Payment Bond with a surety company acceptable to the Owner. Minimum wage rates as determined by the Commissioner of Department of Workforce Development apply to this project. The awarding of this item may be extended for an additional two years at the option of each individual Awarding Authority. The Owner reserves the right to waive any informality in or to reject any or all Bids if deemed to be in its best interest. Contractors are responsible for obtaining current information on Prevailing Wage Rates for all trades employed for the proposed work.

Post-Bid

Water / Sewer

$80,000.00

Public - City

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
5
Bidding Soon
2,170
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2026

April 6, 2026

Project location map

To be determined, Ayer, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.