BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2026 at 8:00 PM

Updated May 15, 2026

Site work and new construction of a military facility in Havelock, North Carolina. Completed plans call for the construction of a military facility; and for site work for a military facility.

P993/995, F-35 Aircraft Maintenance Sustainment Center and Composite Repair Facility, MCAS Cherry Point, NC The justification and approval is being prepared for the use of brand name or equal descriptions on items in a firm fixed price (FFP) construction contract for Design-Bid-Build (DBB) P993/995, F-35 Aircraft Maintenance Sustainment Center and Composite Repair Facility at Marine Corps Air Station (MCAS) Cherry Point, North Carolina. The plans and specifications identify the standard of quality, characteristics, and performance requirements, including manufacturer and model, to establish the basis of design for approximately 119 items across all design disciplines. Other manufacturers may be used during construction provided they meet or exceed the specified standard of quality, characteristics, and performance requirements. A complete list of items and manufacturers with brand name or equal descriptions is included in the attachment. In accordance with DFARS 236.204, the magnitude of construction for this project is over $500,000,000. All inquiries must be submitted in writing and received by the Contract Specialist by the date specified herein in order to permit adequate time to reply to the inquiry. There is no guarantee that PPI's submitted after the cut-off date will be answered before the solicitation closes. Submit all questions to Brittany Cristelli at brittany.n.cristelli.civ@us.navy.mil with the e-mail subject line "N4008526R0002 PPI {Company Name}." Use of the PPI Log template is required. Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. A response will be published via Amendment to SAM.gov. The PPI Log Template (Attachment A) can be found on Contract Opportunities under the Attachments section. PPI Questions shall be submitted no later than fourteen (14) calendar days prior to the proposal due date. The Method of Contractor Selection has not been determined at this Time Question Deadline 03/24/2026 at 12:00 PM ET

Sub-Bidding

Military

$500,000,000.00

Public - Federal

New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2026

July 21, 2026

Project location map

Fike Dr, Havelock, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.