Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 12, 2026 at 7:00 PM
Updated January 13, 2026
Renovation of a municipal facility in Bowling Green, Kentucky. Completed plans call for the renovation of a municipal facility.
Boiler Replacement Project. Respondents are to submit their bid in a clearly marked sealed envelope, with the bid number and description included. The shipping envelope must also list the bid number clearly on the outside. Bids must be received at the Procurement Manager's Office, City Hall Annex, 1017 College Street, Bowling Green, Kentucky, by 10:00 a.m. CT on the date of bid opening. Bids received after the designated date and time will not be considered. All bid forms, information, and specifications are available on the City's website. The City of Bowling Green reserves the right to reject any and all bids and to select the bid determined to be in its best interest. The award will be based on the Lowest Bid Price as permitted in KRS 45A.365. Respondents are invited to attend the virtual opening of submitted bids. The City of Bowling Green, KY is soliciting bids from qualified contractors for the replacement of one (1) existing Laars boiler at the US Bank Building, located at 500 East Main Avenue, Bowling Green, KY 42101. The facility currently has two (2) boilers. Only one boiler shall be replaced. The new boiler shall be the same size as the existing unit or an approved equal (OAE) and must be capable of communicating with the existing boiler, which will remain in service. Requests for approval of "approved equal" equipment must be submitted and approved prior to bid submission and may be requested during the Question and Answer phase only of this IFB. o Boiler Permit o Electrical lockout o Valve off gas and water o Disconnect existing electrical o Disconnect existing water lines o Remove and dispose of existing boiler o Provide and install new Laars Boiler (O.A.E.) on existing curb o Provide and install all necessary water tie-ins to existing piping o Provide and install all necessary natural gas tie-ins to existing piping o Provide and install condensate neutralizer and condensate drain o Provide and install boiler venting o Provide and install insulation on new piping o Provide electricians to rework electric, if needed o Provide and install new circulation pump o Provide and install all required communication hardware and/or software to ensure proper communication between the new boiler and the existing boiler o Start new boiler and ensure proper operation o Contractor shall provide a one (1) year warranty on all workmanship -Boiler: Laars (O.A.E.) -Variable Speed Pump -Condensate Neutralization Kit
Sub-Bidding
Municipal
$200,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 21, 2026
February 16, 2026
500 E Main Ave, Bowling Green, KY
Related To This Project
Bowling Green, KY
Bid Date: Jan 29 2026
Bowling Green, KY
Bid Date: Jan 23 2026
Bowling Green, KY
Bid Date: Jan 22 2026
Bowling Green, KY
Bid Date: Jan 13 2026
Bowling Green, KY
Bid Date: Jan 21 2026
Bowling Green, KY
Bid Date: Jan 12 2026
Bowling Green, KY
Bid Date: Jan 28 2026
Bowling Green, KY
--
Bowling Green, KY
--
Bowling Green, KY
Bid Date: Feb 04 2026
Bowling Green, KY
--
Bowling Green, KY
--
Bowling Green, KY
--
Bowling Green, KY
--
Bowling Green, KY
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
