BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 29, 2026 at 7:00 PM

Updated February 14, 2026

Site work for a transportation facility in Alcoa, Tennessee. Completed plans call for site work for a transportation facility.

Reference Number 0000408404 TYS is one of the fastest growing commercial airports in the United States, and TYS's existing terminal facilities are projected to be inadequate to serve the traveling public in the near future. Therefore, MKAA is embarking on a significant construction program to expand and renovate its terminal facilities and ancillary facilities to accommodate projected passenger growth at TYS. This program has been designated by MKAA as its Terminal Area Development Program ("TADP"). TADP is expected to have four primary components - expansion of the security checkpoint facilities: expansion and renovation of energy facilities, expansion of the airport terminal and other renovations to the terminal and expansion and improvement of adjacent apron facilities. As design for the TADP program proceeds, other components of the TADP may be needed. The CMaR that is selected based upon this RFQ will be expected to assist with the entire TADP. A more detailed description of the TADP and the components described above is included as Exhibit A to this RFQ. Design work on the TADP is progressing, but a significant portion of the design work has only been completed with respect to the expansion of the security checkpoint facilities. Provided below is the anticipated schedule for the selection of a CMaR by MKAA for the TADP. MKAA reserves the right to adjust this schedule and add or remove specific events to meet the needs of MKAA. Any such changes to the schedule will be explained in an addendum. General Requirements - Contractors License Required - Employee Background Checks Required - Federally Funded - Insurance Required - License Required - Safety Standards Plan Question Deadline 01/16/2026 at 12:00 PM ET Questions are submitted online Yes Questions submitted in writing to MKAA for clarification of the information contained in this RFQ or in a subsequent request for proposals to short-listed respondents are not prohibited by this policy

Post-Bid

Transportation Terminals

$150,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

82 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
73
Bidding Soon
821
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2026

March 16, 2026

Project location map

2055 Alcoa Hwy, Alcoa, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.