Site work and paving for a road / highway in Bonita Springs, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of March 26, 2026, the project was awarded to Quality Enterprises USA Inc, with an awarded amount of $15,413,916.71** Qualified contractors are invited to submit sealed bids for the East Terry Street Stormwater and Multi-Use Pathway Project. Services must comply with HUD CDBG-MIT regulations and requirements, as well as those of the Federal Highway Administration and Florida Department of Transportation's Local Agency Program. Respondents must register via the City of Bonita Springs website to access the official bid package, and only bids from registered sources will be accepted. Bidders must submit one original, three copies, and one flash drive with their proposal. Attendance at a mandatory pre-bid conference is required for bid consideration. Questions must be submitted in writing no later than five business days before the bid opening date. Bidders are not to lobby City officials or staff regarding the project. The City may amend requirements or qualifications at its discretion, with changes posted as addenda on the City's website. The City reserves the right to reject any or all bids, waive defects, re-advertise the solicitation, and select the consultant that best meets its needs. Clarification Deadline 2/3/2026 2:00 PM The project is to improve stormwater management conditions along the corridor and provide improved multi-use pathway connectivity. It is anticipated that all improvements will be constructed within the existing right of way. Project components included but are not limited to enclosed stormwater systems, utility relocations, traffic signal installation, roundabout construction, curb and gutter, intersection improvements, multi-use path, sidewalks, bike lanes, pavement and signage improvements, street lighting, and landscaping and irrigation. The Project limits for East Terry Street are from Old 41 Road east to Bonita Grande Drive. The roadway has been divided into segments. Segment 1 is from Old 41 Road east to Imperial Parkway; Segment 2 is from Imperial Parkway east to the Interstate 75 Overpass and Segment 3 is from Interstate 75 Overpass east to Bonita Grande Drive. LAP funding will encompass sidewalk installation from Imperial Parkway to the Interstate 75 Overpass. The Florida Department of Transportation (FDOT) FY-2025-26 Standard Specifications for Road and Bridge Construction are the governing Standard Specifications for the Project. Additional applicable Project Special Conditions and Technical Specifications are included in the Contract Appendices.

Award

Roads / Highways

$15,413,917.00

Public - City

Paving, Site Work

19

9

18

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
7
Bidding Soon
559
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2026

April 30, 2026

Project location map

E Terry St, Bonita Springs, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.