Site work for a water / sewer project in Mount Pleasant, South Carolina. Completed plans call for site work for a water / sewer project.

Bids from qualified and interested Bidders for the David Simmons Jr. Community Dock Repairs project. The project includes an underwater inspection of the existing dock piles and submerged structural components, removal and replacement of deteriorated timber framing and associated structural members, and installation of pile protection in accordance with the engineered drawings. In general, the Scope of Work includes, but is not limited to, repairs to the community dock by removing and replacing damaged structural components, reusing existing decking where practicable, and performing related hardware and connection repairs. Bid alternates are included for full removal and replacement of the existing decking using different material options as well as a remediation method. Question Deadline 01/28/2026 at 12:00 PM ET All work shall be completed within one hundred twenty (120) calendar days from Notice to Proceed. The project consists of repairs to the David Simmons Jr. Community Dock in accordance with the engineered drawings and specifications. Work includes an underwater inspection of the dock piles from bents 51 through 57 to determine the required linear feet (LF) of pile protection, for which Alternate 3 may be used as a remediation option, along with the removal and replacement of deteriorated or damaged timber framing and associated structural members. The Base Bid assumes reuse of the existing decking to the extent practicable, including removal and reinstallation as required to complete structural repairs. Bid alternates are provided for full removal and replacement of the existing IPE decking with either 2x6 Southern Pine No. 1 decking or composite decking, with the finished deck elevation matching the existing conditions. Alternate 3 provides a remediation option for damaged piles found during the underwater inspection of bents 51 through 57, as noted on the plans. The two options chosen were SEASHIELD SERIES 400 PROTECTION SYSTEM PER 5/S6.3 (structural repair) and SEASHIELD SERIES 90 PROTECTION SYSTEM PER 4/S6.3 (pile protection). The Contractor shall furnish all labor, materials, equipment, and incidentals necessary to complete the work within 120 calendar days from Notice to Proceed. BASE BID - David Simmons Jr. Community Dock Repairs 1. Perform underwater inspection of existing dock piles from bent 51 through 57 to determine required repairs in accordance with the engineered drawings (UOM - LS). 2. Remove and replace deteriorated or damaged timber framing, bracing, whalers, and other structural members as shown on the engineered plans (UOM - LS). 3. Remove and reinstall existing decking as required to complete structural repairs; reuse existing decking where practicable (UOM - LS). 4. Remove and replace deteriorated or missing hardware, connectors, and fasteners as required to complete the work in accordance with the plans and specifications (UOM - LS).

Award

Water / Sewer

$286,870.00

Public - City

Site Work

40

7

4

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
2
Bidding Soon
467
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2026

March 20, 2026

Project location map

Multiple Locations, Mount Pleasant, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.