BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 8, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a mixed-use development in Centreville, Maryland. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

**As of March 1, 2026, this project has not yet been awarded. A timeline for the award has not yet been established.** The Town of Centreville (Town) is accepting sealed bids from qualified and interested Contractors for the following project: The Town is seeking a Site Contractor to provide sidewalks, parking lot construction, small diameter waterline extension, light grading, and erosion and sediment control measures in accordance with the approved Phase 3 Park Plan. This project is funded in full by a Maryland Department of Natural Resources Community Parks and Playground Grant. The Town reserves the right to reject any and all bids, to waive any requirements and to accept all or part of any bid considered to be in the best interest of the Town. Award of the contract is subject to the approval of the Town Manager and Town Council of Centreville. The Town is an Equal Opportunity Employer. Discrimination based on age, race, sex, disability, or national origin is expressly prohibited. o Selected Contractor is to consult with the Town during construction to avoid any clear missteps in the project execution. o Contractor to arrange with the Town the scheduling of the field survey to layout the parking lot, and sidewalks. Contractor must specify the desired offsets for the stakeout if any. o All appropriate permits shall be in hand prior to any work. o Contractor shall contact Miss Utility and have ticket in hand prior to construction. There may be one master ticket for the entire site under which you may operate. o Contractor shall exercise care to preserve existing landscaping and to repair any tracks made in the turf prior to final payment. o Contractor shall make every effort to not disturb the existing wildflower meadow and surrounding lawn areas during sidewalk construction. The use of smaller but suitable equipment is advised. o All debris, excavated materials, etc. shall be removed from the site. o Approved Phase of Construction shall be adhered to unless modified by Department of Public Works. Bid result Martins Excavation - Electric - $47,550 Martins Excavation - Bandshell - $61,060 Middleton’s Construction - Civil $147,343

Award

Sidewalks / Parking Lot

$255,953.00

Public - City

Paving, Site Work

10

4

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
656
Active Projects
275
Bidding Soon
4,137
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2026

March 9, 2026

Project location map

212 Watson Rd, Centreville, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.