BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 29, 2026 at 7:00 PM

Updated January 30, 2026

Site work for a water / sewer project in Siren, Wisconsin. Completed plans call for site work for a water / sewer project.

The project involves the installation of an 8-inch HDPE watermain in 3rd Avenue, connecting existing water mains located in Tower Road and STH 35. The work includes approximately 1,400 lineal feet of 8-inch diameter HDPE watermain using open cut and directional drilling methods; installation of hydrants, services, and other appurtenances associated with the water main; restoration of disturbed surfaces, including concrete sidewalk and driveway patching, asphalt patching, and placement of topsoil and seed; as well as associated erosion control and traffic control. Instructions to bidders: No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award. The certified check or bid bond will be returned once the contract is signed, or forfeited as liquidated damages if the bidder fails to execute the contract within 15 days. No bidder may withdraw their bid within 60 days after opening. Minimum wages paid must comply with Federal Davis Bacon Wage Rates. Bidders must comply with requirements regarding employment conditions, minimum wage rates, and participation goals for disadvantaged, minority, and women-owned businesses. Compliance with "Build America, Buy America" requirements for materials is required. Bid proposals may be denied if these requirements are not met and waivers are required. Question Deadline 01/13/2026: Teresa Anderson, tanderson@msa-ps.com, (715) 304-0308. Questions received less than seven days prior to the date for opening of Bids may not be answered A municipality, in awarding prime contracts, and primary contractor, in awarding subcontracts, are required to make a good faith effort to achieve a combined minimum goal of 15% participation for MBE/WBE utilization in accordance with s.NR 162.09(3)

Award

Water / Sewer

$278,185.00

Public - City

Site Work

14

16

7

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
131
Bidding Soon
1,364
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2026

February 19, 2026

Project location map

3rd Ave, Siren, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.