Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 12, 2026 at 7:00 PM

Updated January 13, 2026

Renovation of an educational facility in Walla Walla, Washington. Completed plans call for the renovation of a educational facility.

10 Ton Winery Glycol Chiller - Replacement Unit Deadline for Submitting Questions 12/31/2025 A. General 1. Application: Replacement glycol chiller for existing wine tank cooling system in the College Cellars production winery. Existing glycol distribution piping and tank controls remain in place. 2. Type: Packaged, air-cooled industrial glycol chiller for winery service. 3. Nominal Capacity: o Minimum 120,000 BTU/hr (10 tons) at standard rating conditions. o Minimum 96,000 BTU/hr (8 tons) at 28F leaving glycol, 30-35% propylene glycol, and 90-95F ambient (vendor must provide performance data at these conditions). 4. Location: Outdoor pad adjacent to cellar; unit must be weatherproof and outdoor-rated. 5. Refrigerant: R-410A or equivalent code-compliant refrigerant suitable for low-temperature glycol service. B. Operating Conditions 1. Leaving Fluid Temperature Range: o Adjustable temperature range appropriate for normal winery operations, including coldsoak, fermentation temperature control, and cold stabilization (typically 20-70F adjustable range, vendor to specify). 2. Ambient Temperature Range: o Operating capability of 0F to 100F ambient (or wider), with no loss of rated capacity at 90-95F. 3. Glycol Solution: o Compatible with 30-35% propylene glycol in water. Vendor to recommend concentration and freeze protection. C. Electrical & Controls 1. Power Supply: o 208/230V, 3-phase, 60 Hz. o Vendor to state MCA and MOCP. 2. Control Panel: o UL/ETL listed panel with integrated disconnect and standard safeties. o Local digital temperature control at the chiller; no remote interface required. o Alarms for high/low temperature, flow faults, refrigerant pressure, and compressor protection. D. Hydronic (Glycol) Circuit 1. Reservoir: o Integrated insulated glycol reservoir, >=40 gallons usable volume. o Stainless or heavy-duty polymer with a sealable (but accessible) lid and visible level indication. 2. Pump: o Integrated process pump sized for approximately >=40 GPM at 25-30 psi to match the existing system. o Non-ferrous wetted components. 3. Connections & Piping: o Supply/return connections sized for a 10-ton chiller (>=1.25" NPT or equivalent). o Existing cellar glycol piping layout is already installed. o Vendor must confirm compatibility with WWCC's existing glycol stubs and supply any adapter fittings as needed. 4. Glycol Fill: o System must include fill and air-bleed provisions. o WWCC will provide glycol and perform final fill; vendor to support startup and purge. E. Mechanical & Construction o Scroll compressors (single or tandem) or equivalent high-eUiciency design. o Stainless plate or equivalent industrial evaporator suited for glycol. o Outdoor-rated enclosure with corrosion-resistant finish. o Marked lifting points for forklift or crane. o Vendor to provide dB(A) noise rating. F. Controls & Integration o Chiller will supply a stable glycol temperature; individual tank control is already in place at WWCC via existing solenoids/thermostats. o No building automation integration required beyond basic alarm indication at the unit. G. Compliance & Warranty o UL or ETL listed complete package and control panel. o Minimum 1-year parts & labor warranty and 5-year compressor parts warranty. o Vendor to provide manuals, electrical diagrams, and startup documentation. 12/31/25 - 5:00 pm The window for asking questions about the RFQ/RFP closes-all answers to questions submitted will be emailed to bidders

Post-Bid

Educational

$25,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
14
Bidding Soon
410
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2026

February 11, 2026

Project location map

To Be Determined, Walla Walla, WA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed